NIRCam News
December 12, 2005
Previous editions are available in the archive.
|
Tuesday Telecon
Tuesday, December 13, 1600 EDT
No telecon this week due to meeting at Axsys.
|
NIRCam Calendar
| Date |
Event |
Details |
| 12/13-14/05 |
OBA Status at Axsys |
Cullman, AL |
| 12/20/05 |
NIRCam Monthly 0900 PDT
|
Palo Alto, CA |
| 12/20/05 |
NOTES TIM (following monthly) |
Palo Alto, CA |
| To be rescheduled |
FPA & FPA Housing CDR |
Palo Alto, CA |
| TBA |
GSE CDR |
Palo Alto, CA |
| 1/19/06 |
NIRCam Monthly |
Camarillo, CA |
| 1/24-26/06 |
JWST Mission SDR |
GSFC |
| late Jan/06 |
IRSU SRR |
GSFC |
| 1/31-2/2/06 |
JWST SWG |
Redondo Bch, CA |
| 2/2/06 |
NIRCam ICE CDR |
Palo Alto, CA |
| 2/3/06 |
NIRCam FPE CDR |
Palo Alto, CA |
| TBD 5/06 |
ISIM Thermal PDR |
GSFC |
| 2/14/06 |
NIRCam FSW CDR |
Palo Alto, CA |
| 2/22-23/06 |
ISIM FSW PDR |
GSFC |
| 2/23/06 |
NIRCam Monthly |
Palo Alto, CA |
| 3/23/06 |
NIRCam Monthly |
Tucson, Az |
| 3/28/06 |
NIRCam I&T CDR |
Palo Alto, CA |
| 4/25-27/06 |
JWST Quarterly |
Noordwijk, Netherlands |
| 5/25/06 |
NIRCam Monthly |
GSFC |
| 6/22/06 |
NIRCam Monthly |
Palo Alto, CA |
| 7/20/06 |
NIRCam Monthly |
Palo Alto, CA |
| 8/31/06 |
NIRCam Monthly |
Palo Alto, CA |
|
Last Week's Accomplishments
NIRCam Activities for Week Ending 12/06/05
1) Held a very useful ASIC Operations TIM at Rockwell.
Many thanks to Markus Loose for his help.
2) Preparations for the FPA CDR are well underway with
SW FPA drawing set complete and the LW set in final review.
The FPA ICD is being released.
3) Fact finding visit was paid to Barr Associates in preparation
for final bandpass filter vendor selection.
4) ICE Box thermal analysis has been completed.
5) Production of the ZnSe ETU lenses has begun.
6) Optical test and alignment equipment such as a 4D
interferometer and the lens alignment station have started
arriving.
|
Announcements
Detector (FPA & Housing) CDR postponed to late January.
|
NIRCam Top 5
| |
Item |
Status |
Action |
Next Report |
| 1 |
Requirements |
see below |
|
|
| 2 |
Bench cracks |
tests at Axsys 12/13-14 |
|
|
| 3 |
Detector Packaging |
|
|
|
| 4 |
NOTES/I&T |
Trade concluded - NOTES will be cold. |
|
|
| 5 |
Budget |
|
|
|
|
Document Status
| DRD |
Title |
Status |
Due |
Comments |
| SE-04 |
Verification Plan |
Rejected |
7/27/05 |
|
| IT-01 |
I&T Plan |
Rejected |
tbd |
On hold for resolution of NOTES testing plan. |
| SA-14 |
Safety Plan |
Review & Comment |
8/15/05 |
Delivered 7/29/05 |
|
Pending Changes
| Mod |
Mod Descr |
CCR # |
RTC# |
Description |
Cost/No |
Status |
Due |
Comments |
ECD |
| tbd |
Launch Slip |
|
|
22-mo Launch Slip, 10-mo delivery slip |
|
RFP |
11/28/05 |
proposal late |
|
| |
|
334 |
|
10-month delivery slip |
yes |
Complete |
|
|
|
| |
|
361 |
|
22-mo launch slip |
yes |
Complete |
|
|
|
| tbd |
Wave 5 |
|
|
Wave 5 Changes |
yes |
RFP |
|
waiting for IRD
|
|
| |
|
312 |
|
ISIM Reqts Doc Rev A |
yes |
Complete |
|
Adds reliability calcs |
|
| |
|
382 |
|
ISIM Reqts Doc Rev B |
|
CCB |
|
|
|
| |
|
TBD |
|
NIRCam Spec Rev D |
yes |
draft |
|
ISIM RD Rev B, IRD Rev D |
|
| |
|
313 |
|
SOW Rev E (Test Changes) |
Yes |
Complete |
|
|
|
| |
|
339 |
|
MAR Rev B |
Yes |
Complete |
|
Adds S/W QA |
|
| |
|
364 |
|
MICD EO# 1, 2, 3 |
Yes |
Complete |
|
|
|
| |
|
385 |
|
IRD Rev D |
Yes |
CCB |
|
|
|
| |
|
|
001D |
Synchronization |
Yes |
complete |
|
|
|
| |
|
|
008F |
Thermal |
|
complete |
|
|
|
| |
|
|
014C |
Stray Light |
|
complete |
|
|
|
| |
|
|
015G |
I&T Test Aids |
|
complete |
|
|
|
| |
|
|
017D |
On Orbit Sine |
|
complete |
|
|
|
| |
|
|
018A |
Radiative Heat Transfer |
|
complete |
|
|
|
| |
|
|
025B |
PIL Distortion |
|
complete |
|
|
|
| |
|
|
026D |
Mechanisms |
|
complete |
|
|
|
| |
|
|
028F |
ASIC |
|
complete |
|
|
|
| |
|
|
029B |
I&T Test Aids |
|
complete |
|
|
|
| |
|
|
031A |
PIL Source Location |
|
complete |
|
|
|
| |
|
|
032C |
WFS&C |
|
complete |
|
|
|
| |
|
|
033C |
Electrical TBRs |
|
complete |
|
|
|
| |
|
|
035A |
PIL WFE |
|
complete |
|
|
|
| |
|
|
037A |
FPA Isolation |
|
complete |
|
|
|
| |
|
|
038A |
ICE Harness Mass |
|
complete |
|
|
|
| |
|
|
042A |
Optical Cubes |
|
complete |
|
|
|
| |
|
|
043C |
Heater Voltage & Power |
|
complete |
|
|
|
| |
|
|
044B |
Cryo Metrology |
|
complete |
|
|
|
| |
|
|
045D |
WFS&C #2 |
|
complete |
|
|
|
| |
|
|
046D |
EMC #2 |
|
complete |
|
|
|
| |
|
|
047D |
WFS&C #3 |
|
complete |
|
|
|
| |
|
|
048C |
Optical Alignment |
|
complete |
|
|
|
| |
|
|
051C |
Thermal #2 |
|
complete |
|
|
|
| |
|
|
053A |
Electrical TBXs #2 |
|
complete |
|
|
|
| |
|
|
055A |
FSW Changes for ASIC |
|
complete |
|
|
|
| |
|
|
060A |
Typos & Misc Corrections |
|
complete |
|
|
|
| |
|
tbd |
|
NIRCam ETU Specification |
|
Loop 1 |
|
|
|
| tbd |
|
|
|
Wave 6 Changes |
|
|
|
|
|
| |
|
tbd |
|
IRD Rev E |
|
|
11/30/05 |
|
|
| |
|
|
030A |
FSW Telemetry Rate |
|
Loop 2 |
|
|
|
| |
|
|
034A |
Outgassing Rate |
|
Loop 1 |
|
|
|
| |
|
|
036A |
Structural Interface Load |
|
Loop 1 |
|
|
|
| |
|
|
041A |
Radiation |
|
Loop 2 |
|
|
|
| |
|
|
049A |
Handling Procedures |
|
Loop 1 |
|
|
|
| |
|
|
050A |
WFS&C #4 |
|
Loop 1 |
|
|
|
| |
|
|
052A |
Moving Target |
|
Loop 2 |
|
|
|
| |
|
|
054A |
Stray Light #2 |
|
Loop 1 |
|
|
|
|
NIRCam Needs
| Need |
Status |
ECD |
Assigned |
|
| Resolve TBXs in NIRCam Reqts Documents |
See "Pending Changes" above. |
7/31/05 TBR |
Lundquist |
|
| NIRCam Drill template to Axsys |
delayed by funding runout at GSFC |
10/15/05 |
Crow |
|
| Cryo refractive index measurements of Si |
Fused Silica complete |
|
Leviton |
|
| ASIC Ops Concept & interface documents |
TIM 12/2/2005 |
|
Dutta |
|
| Spacewire ICD & Spec |
|
|
Aguilar |
|
| Loads from harness/thermal straps |
|
|
Crow |
|
| Info on ground strap, if any |
|
|
McCloskey |
|
| SIDU Upgrade for ASIC |
|
|
Guy |
|
|
NIRCam TBD/TBR Progress & Plan

|
|
|
|