Date Event Details
TBD Feb 06 ISIM Thermal PDR GSFC
11/16/05 Verification TIM @ ATC Palo Alto, CA
11/17/05 Stray Light/Baffles CDR Palo Alto, CA
11/17/05 NIRCam Monthly @ ATC Palo Alto, CA
2/22-23/06 ISIM FSW PDR GSFC
12/7/05 ICE CDR Palo Alto, CA
12/8/05 FPE CDR Palo Alto, CA
TBD Jan 06 IRSU SRR GSFC
12/15/05

NIRCam Monthly @ Rockwell

Camarillo, CA
12/21/05 FPA & FPA Housing CDR Palo Alto, CA
TBA I&T CDR Palo Alto, CA
TBA GSE CDR Palo Alto, CA
1/24-26/06 JWST Mission SDR GSFC
1/31-2/2/06 JWST SWG Redondo Bch, CA
2/14/06 FSW CDR Palo Alto, CA
4/25-27/06 JWST Quarterly Noordvijk, Netherlands

Last Week's Accomplishments

 

NIRCam Activities Week Ending 11/15/05

1) Finalized plans for EDM removal of cracks and new tests to occur Dec 12-14 at AXSYS.

2) Arizona is releasing the FPA ICD to LM ATC .

3) Beamsplitter work re-started at JDS Uniphase after the Spetember stop work.

4) Final tweaks of len prescriptions and mirror locations performed.

Announcements

NIRCam Top 5
  Item Status Action Next Report
1 Requirements see below    
2 Detector BCS     11/08/05
3 Detector Packaging    

 

4 NOTES/I&T   Warm NOTES?  
5 Filter Wheel Accuracy allowing retries may solve problem    
Document Status
DRD Title Status Due Comments
SE-04 Verification Plan Rejected 7/27/05  
IT-01 I&T Plan Rejected tbd On hold for resolution of NOTES testing plan.
SA-14 Safety Plan Review & Comment 8/15/05 Delivered 7/29/05
Pending Changes
Mod Mod Descr CCR # RTC# Description Cost/No Status Due Comments ECD
tbd 3-mo schedule slip     3-Month Schedule Slip Yes mod      
tbd Wave 4     Wave 4 Changes yes Proposal Review 11/1/05    
    239   NIRCam SOW Rev D yes Complete   ASIC  
    243/333   DRD Rev F/G yes Complete   EEE Parts  
    164/235   DMGSER Rev -/A

yes

Complete      
tbd Launch Slip     22-mo Launch Slip, 10-mo delivery slip   RFP 11/16/05    
    334   10-month delivery slip yes Complete      
    361   22-mo launch slip yes Complete      
tbd Wave 5     Wave 5 Changes yes        
    313   SOW Rev E (Test Changes) Yes Complete      
    339   MAR Rev B Yes Complete   Adds S/W QA  
    312   ISIM Requirements Doc Rev A no Complete      
    364   MICD EO# 1, 2, 3 Yes CCB 9/27/05    
    tbd   NIRCam Spec Rev C   Loop 1      
    tbd   IRD Rev D Yes Draft 10/25/2005    
      001D Synchronization Yes complete      
      008F Thermal   complete      
      014C Stray Light   complete      
      015G I&T Test Aids   complete      
      017D On Orbit Sine   complete      
      018A Radiative Heat Transfer   complete      
      025B PIL Distortion   complete      
      026D Mechanisms   complete      
      028F ASIC   complete      
      029B I&T Test Aids   complete      
      031A PIL Source Location   complete      
      032C WFS&C   complete      
      033C Electrical TBRs   complete      
      034A Outgassing Rate   Loop 1 9/27    
      035A PIL WFE   complete      
      037A FPA Isolation   complete      
      038A ICE Harness Mass   Loop 1   mtg 10/11  
      041A Radiation   Loop 1 9/16/05 comments late  
      042A Optical Cubes   complete      
      043C Heater Voltage & Power   Loop 1 9/30 Stu & Julie  
      044B Cryo Metrology   Loop 2 10/10    
      045D WFS&C #2   complete      
      046D EMC #2   complete      
      047D WFS&C #3   complete      
      048C Optical Alignment   complete      
      051C Thermal #2   Loop 1 9/23 Stu & Julie  
      053A Electrical TBXs #2   complete      
      054A Stray Light #2   Loop 1 9/2/05 D. Kelly  
tbd tbd tbd   IRD Rev E     11/30/05    
      030A FSW Telemetry Rate   Loop 1 9/21/05 Aguilar  
      036A Structural Interface Load   Loop 1      
      049A Handling Procedures   Loop 1      
      050A WFS&C #4   Loop 1      
      052A Moving Target   Loop 2      
      055A FSW Changes for ASIC   Loop 2 9/21    
NIRCam Needs
Need Status ECD Assigned  
Resolve TBXs in NIRCam Reqts Documents See "Pending Changes" above. 7/31/05 TBR Lundquist  
MICD EO 4 & additional envelope for baffle Draft      
NIRCam Drill template to Axsys delayed by funding runout at GSFC 10/15/05 Crow  
Cryo refractive index measurements of Si, Fused Silica     Leviton  
ASIC Ops Concept & interface documents ops concept out for review   Dutta  
Spacewire ICD & Spec     Aguilar  
Loads update for OBA/ISIM brackets Delivered to Alison on 8/18   Crow  
Loads from harness/thermal straps     Crow  
Info on ground strap, if any     McCloskey  
SIDU Upgrade for ASIC     Guy  

NIRCam TBD/TBR Progress & Plan