October 8, 2007
Previous editions are available in the archive.
Tuesday Telecon
|
Date |
Meeting Agenda |
GSFC Location |
| Oct 9, 2007, 4 pm EDT | Optics – FOV, boresight and pupil roll RTC introductio Bench Status |
Bld 22 rm 184 |
|
Oct 16, 2007, 4 pm EDT |
Bench Status |
Contact Julie for a copy GSFC location: bld 22 room 399 |
Announcements
Other Telecons
| Tuesday Oct 9, 2007 12 pm -5 pm EDT | NIRCam FSW Activity Node Review (Code walk-through continuation) | Charts will be posted to NGIN’s shared files (ISIM/NIRCam) by Oct 4th GSFC location: Bld 22 room 399 Dial in: 866-793-5733 Passcode: 808642 Web Ex:Address: https://www.mymeetings.com/emeet/join/index.jsp?customHeader=mymeetingsMeeting Number: 742293453, NO PASSWORD |
NIRCam Calendar
|
Date |
Event |
Details |
| Oct 12, 2007 | Photogrammetry SRR | NGST ECO |
| Oct 18, 2007 |
NIRCam Monthly |
Palo Alto |
| Oct 23-24, 2007 | JWST SWG Meeting | STScI |
| Oct 25-26, 2007 | ICDH CDR | GSFC |
| Nov 6-8, 2007 |
JWST Partners Workshop |
Maryland |
| Nov 27-29, 2007 |
OTE PDR |
NGST? |
| Dec 4-5, 2007 | IOTA-ISIM Optical Test Audit | NGST ECO |
| Dec 12, 2007
|
NIRCam Monthly
|
Palo Alto
|
| Upcoming ISIM CDRs | ||
| Jan 29-30, 2008 | ISIM Region 2 and Harness Radiatior PDR | |
| Jan 31-Feb 1, 2008 | ISIM Structure CDR | |
| TBD Feb, 2008 | ISIM Flight Software CDR | |
| April 23, 2008 | IRSU CDR | |
| Mar 31- Apr 4, 2008 | JWST PDR | GSFC, Bld 8 Aud |
| 1st week of June, 2008 | ISIM Thermal Control CDR | |
| Sept 8-11, 2008 | ISIM CDR | GSFC |
1) NIRCam team personnel visited Axsys to review the test
report from mirror work. A revised protocol for testing
coupons for stress was developed.
2) NIRCam Science Team members participated in the JWST conference
and held a team meeting.
3) Substantial progress has been made in pulling in the FAM bearing schedule so
the impact to flight delivery is being greatly reduced.
4) Lenses 1 and 3 of the PIL assembly are proceeding through final
fabrication and testing steps. Coastal was still having problems
with Lens 2 so NIRCam sent a person to visit and resolve the
remaining issues.
5) Pathfinder build up is progressing with the newly designed and
manufactured shims required for the DBS and the "opposite" side of
the LiF collimator lens now in hand.
6) Pre-ship review of the flight DBS parts went very well. The flight
parts are wonderfully flat.
|
DRD |
Title |
Status |
Due |
Comments |
|
SA-02 |
Contamination Control Plan |
Under Review |
See JWST-MEMO-6835, requested for resubmittal last June. |
|
|
SE-04 |
Verification Plan |
GSFC Review |
3/6/2007 |
|
|
SE-10 |
Math Models |
Returned with comments |
11/8/2006 |
See JWST-MEMO-7015 regarding mechanical models only, partially rejected in August with requested resubmittal in 90 days. |
|
PM-01 |
Project Management Plan |
Under Review |
|
|
|
FSW-01 |
FSW Product Plan |
needs update |
|
See JWST-MEMO-4063 |
|
FSW-02 |
FSW Vision Doc |
needs update |
|
See-JWST-MEMO-4210 |
|
FSW-03 |
FSW Reqts Spec |
returned w/ comments |
1/9/2007 |
Accepted with comments in mid-November with a requested update
due in 60 days (mid-January) |
|
OPS-11 |
Ops Concept |
needs update |
|
See JWST-MEMO-4518 |
Pending Changes (needs updating)
|
Mod |
CCR # |
RTC# |
Description |
Cost |
Status |
Due |
Comments |
|
|
|
|
|
|
|
|
|
ISIM Level NIRCam Risks (needs updating)
|
Number |
Title |
Impact |
Likelihood |
Rating |
|
NIRCam-32 |
NIRCam Lens Mounts |
C |
A |
Low |
|
NIRCam-138 |
NIRCam Wavefront Error (low/mid/high sf) |
D |
B |
Medium |
|
NIRCam-143 |
NIRCam Optical Transmission |
C |
B |
Low |
|
NIRCam-191 |
NIRCam Detector BCS Failures |
C |
A |
Low |
|
NIRCam-250 |
NIRCam Region 1 Heat Transfer |
B |
C |
Medium |
|
NIRCam-251 |
NIRCam Optical Alignment |
C |
B |
Low |
|
NIRCam -280 |
Extra Module-level cryotest with FPAs integrated |
|
|
|
|
Acronym List |
|
|
ASIC |
Application-Specific Integrated Circuit |
|
ASMIF |
Ambient Science Instrument Mechanical Interface Fixture |
|
BCS |
Balance Composite Structure |
|
CCDH |
Common Command & Data Handling |
|
CMLB |
Ceramic Multi-Layer Board |
|
CPT |
Comprehensive Performance Test |
|
DBS |
Dichroic Beam Splitter |
|
DHS |
Dispersed Hartmann Sensor |
|
EEE |
Electrical, Electronic, and Electromechanical (Parts) |
|
EOL |
End-of-life |
|
ETU |
Engineering Test Unit |
|
FOV |
Field of View |
|
FPA |
Focal Plane Assembly |
|
FPE |
Focal Plane Electronics |
|
FSW |
Flight Software |
|
GSFC |
|
|
GSE |
Ground Support Equipment |
|
I&T |
Integration & Test |
|
ICD |
Interface Control Document |
|
ICE |
Instrument Control Electronics |
|
ICP |
Interconnect Panel |
|
IRD |
Interface Requirements Document |
|
IOS |
ISIM-to-OTE-and-Spacecraft |
|
ISIM |
Integrated Science Instrument Module |
|
KM |
Kinematic Mount |
|
MIPS |
Million Instructions Per Second |
|
MRR |
Manufacturing Readiness Review |
|
NGIN |
Next Generation Integrated Network |
|
OA |
Optics Assembly |
|
OBA |
Optical Bench Assy |
|
OOB |
Out of Band |
|
OTE |
Optical Telescope Element |
|
PAR |
Pupil Alignment Reference |
|
PDR |
Preliminary Design Review |
|
PFD |
Passive Friction Device |
|
PIL |
Pupil Imaging Lens |
|
PSD |
Power Spectral Density |
|
RFA |
Request for Action |
|
RTC |
Request for Technical Coordination |
|
Rx |
Prescription |
|
SCA |
Sensor Chip Assembly |
|
SOW |
Statement of Work |
|
STOP |
Structural, Thermal, Optical (Analysis) |
|
SWG |
Science Working Group |
|
TBR |
To Be Reviewed |
|
TIMs |
Technical Interchange Meeting |
|
T-NAR |
Technology Non-Advocate Review |
|
TV |
Thermal Vacuum |
|
UPS |
Uninterruptible Power Supply |
|
WFE |
Wavefront Error |
|
WFS |
Wavefront Sensing |