Tuesday Telecon

Tuesday, October 4, 1600 EDT
Goddard Location: 22/C399
Dial in information: 877-951-3250, Passcode 108321

Agenda: RTC-058 - Pupil Alignment Reference
PDR RFA #14 - V1-down testing

NIRCam Calendar
Date Event Details
10/11-12/05 Optics Summit Greenbelt, MD ECO
10/18/05 NIRCam Monthly @ ATC Palo Alto, CA
10/24/05 JWST Mgmt Visit to ATC Palo Alto, CA
10/25-26/05 ISIM EMC Summit GSFC
10/27/2005 ISIM Harness PDR GSFC
11/1/05 OTM (aka STOP) Analysis TIM Palo Alto, CA
11/8/05 Detector Status @ Rockwell Camarillo, CA
11/15-16/05 ISIM Thermal PDR GSFC
11/16/05 Stray Light/Baffles CDR Palo Alto, CA
11/17/05 NIRCam Monthly @ ATC Palo Alto, CA
12/6-7/05 ISIM FSW PDR GSFC
12/7/05 ICE CDR Palo Alto, CA
12/8/05 FPE CDR Palo Alto, CA
12/14/05 IRSU SRR GSFC
12/15/05

NIRCam Monthly @ Rockwell

Camarillo, CA
12/21/05 FPA & FPA Housing CDR Palo Alto, CA
TBA I&T CDR Palo Alto, CA
TBA GSE CDR Palo Alto, CA
TBA FSW CDR Palo Alto, CA
1/24-26/06 JWST Mission SDR GSFC
1/31-2/2/06 JWST SWG Redondo Bch, CA
4/25-27/06 JWST Quarterly Noordvijk, Netherlands

Last Week's Accomplishments

 

NIRCam Activities fro Week Ending 9/27/05

1) Resolution of RTCs continues (extrapolation of current
trend would have all closed by mid-Dec).
2) New solid model of the short wavelength FPA was produced.
3) U of Az personnel saw a demonstration of an off-the-shelf
surface measurement device with adequate working distance
to be used with our metrology dewar.
4) The DHAS that will also serve as the Arizona data archive
is now on-line and receiving copies of old test data.
5) Working with a Brush-Wellman consultant on selecting locking devices for bolts in the Be bench.
6) Have created a preliminary FAM baffle/cover design which will need iteration with the ISIM Team to avoid cones of light, etc.

Announcements

 

 

NIRCam Top 5
  Item Status Action Next Report
1 Requirements see below    
2 Detector BCS     9/30/05
3 Detector Packaging    

 

4 NOTES/I&T   Warm NOTES?  
5 Filter Wheel Accuracy allowing retries may solve problem    
Document Status
DRD Title Status Due Comments
SE-04 Verification Plan Rejected 7/27/05  
IT-01 I&T Plan Rejected tbd On hold for resolution of NOTES testing plan.
SA-14 Safety Plan Review & Comment 8/15/05 Delivered 7/29/05
Pending Changes
Mod Mod Descr CCR # RTC# Description Cost/No Status Due Comments ECD
tbd 3-mo schedule slip     3-Month Schedule Slip Yes mod      
tbd Wave 4     Wave 4 Changes yes RFP 10/3/05    
    239   NIRCam SOW Rev D yes Complete   ASIC  
    243/333   DRD Rev F/G yes Complete   EEE Parts  
    164/235   DMGSER Rev -/A

yes

Complete      
tbd Launch Slip     22-mo Launch Slip, 10-mo delivery slip   RFP 11/16/05    
    334   10-month delivery slip yes Complete      
    361   22-mo launch slip yes Complete      
tbd Wave 5     Wave 5 Changes yes        
    313   SOW Rev E (Test Changes) Yes Complete      
    339   MAR Rev B Yes Complete   Adds S/W QA  
    312   ISIM Requirements Doc Rev A no Complete      
    364   MICD EO# 1, 2, 3 No comment 9/27/05    
    tbd   NIRCam Spec Rev C   Loop 1      
    tbd   IRD Rev D   Draft 9/30/05    
      001D Synchronization Yes complete      
      008F Thermal   complete      
      014C Stray Light   complete      
      015D I&T Test Aids   Loop 1   Davila/Hagopian  
      017C On Orbit Sine   complete      
      018A Radiative Heat Transfer   complete      
      025B PIL Distortion   complete      
      026D Mechanisms   complete      
      028F ASIC   complete      
      029B I&T Test Aids   complete      
      031A PIL Source Location   complete      
      032C WFS&C   complete      
      033A Electrical TBRs   Loop 2 9/30    
      034A Outgassing Rate   Loop 1 9/27    
      035A PIL WFE   complete      
      037A FPA Isolation   complete      
      038A ICE Harness Mass   Loop 1   mtg 9/20  
      041A Radiation   Loop 1 9/16/05 comments late  
      042A Optical Cubes   complete      
      043A Heater Voltage & Power   Loop 1 9/23/05 Stu & Julie  
      044A Cryo Metrology   Loop 1   mtg 9/27  
      045A WFS&C #2   complete      
      046A EMC #2   complete      
      047A WFS&C #3   complete      
      048A Optical Alignment   Loop 1   mtg 9/27  
      051A Thermal #2   Loop 1 9/23 Stu & Julie  
      053A Electrical TBXs #2   Loop 2 9/30    
      054A Stray Light #2   Loop 1 9/2/05 D. Kelly  
tbd tbd tbd   IRD Rev E     11/30/05    
      030A FSW Telemetry Rate   Loop 1 9/21/05 Aguilar  
      036A Structural Interface Load   Loop 1      
      049A Handling Procedures   Loop 1      
      050A WFS&C #4   Loop 1      
      052A Moving Target   Loop 2      
      055A FSW Changes for ASIC   Loop 2 9/21    
NIRCam Needs
Need Status ECD Assigned  
Resolve TBXs in NIRCam Reqts Documents See "Pending Changes" above. 7/31/05 TBR Lundquist  
MICD EO 4 & additional envelope for baffle Draft      
NIRCam Drill template to Axsys   10/15/05 Crow  
Cryo refractive index measurements of Si, Fused Silica     Leviton  
ASIC Ops Concept & interface documents ops concept out for review   Dutta  
Spacewire ICD & Spec     Aguilar  
Loads update for OBA/ISIM brackets Delivered to Alison on 8/18   Crow  
Loads from harness/thermal straps     Crow  
Info on ground strap, if any     McCloskey  
SIDU Upgrade for ASIC     Guy  

NIRCam TBD/TBR Progress & Plan