Agenda: Discuss plans for IRD Rev D.
RTC-045A - WFS&C #2
RTC-047A - WFS&C #3
if time permits: RTC 15, 44, 48
|
NIRCam Calendar
| Date |
Event |
Details |
| 9/30/05 |
Detector BCS Failure Status Review |
Camarillo, CA |
| 10/11-12/05 |
Optics Summit |
Greenbelt, MD ECO |
| 10/18/05 |
NIRCam Monthly @ ATC |
Palo Alto, CA |
| 10/24/05 |
JWST Mgmt Visit to ATC |
Palo Alto, CA |
| 10/25-26/05 |
ISIM EMC Summit |
GSFC |
| 10/27/2005 |
ISIM Harness PDR |
GSFC |
| 11/1/05 |
OTM (aka STOP) Analysis TIM |
Palo Alto, CA |
| 11/8/05 |
Detector Status @ Rockwell |
Camarillo, CA |
| 11/15-16/05 |
ISIM Thermal PDR |
GSFC |
| 11/16/05 |
Stray Light/Baffles CDR |
Palo Alto, CA |
| 11/17/05 |
NIRCam Monthly @ ATC |
Palo Alto, CA |
| 12/6-7/05 |
ISIM FSW PDR |
GSFC |
| 12/7/05 |
ICE CDR |
Palo Alto, CA |
| 12/8/05 |
FPE CDR |
Palo Alto, CA |
| 12/14/05 |
IRSU SRR |
GSFC |
| 12/15/05 |
NIRCam Monthly @ Rockwell
|
Camarillo, CA |
| 12/21/05 |
FPA & FPA Housing CDR |
Palo Alto, CA |
| TBA |
I&T CDR |
Palo Alto, CA |
| TBA |
GSE CDR |
Palo Alto, CA |
| TBA |
FSW CDR |
Palo Alto, CA |
| 1/24-26/06 |
JWST Mission SDR |
GSFC |
| 1/31-2/2/06 |
JWST SWG |
Redondo Bch, CA |
| 4/25-27/06 |
JWST Quarterly |
Noordvijk, Netherlands |
|
Last Week's Accomplishments
- Beginning to replan work in light of FY05 funding shortfall. Work has been stopped at all suppliers.
- Held an internal review of all aspects of PIL design as part of declaring the design complete and final.
- Continued working on RTCs and associated TBXs.
- Completed work on FPE motherboard schematic and beginning layout of the board. Work on boards at external shops on hold because of funding constraints.
- Continued use of digital I/O board in development of code for ICE Box FPGAs.
- Complete assessment of FSW memory usage -- at 30% of allocation which is judged to be satisfactory for this point in the development cycle.
|
Announcements
NIRCam Monthly Charts from 9/21 are available on NGIN:
JWST-RPT-005560
|
NIRCam Top 5
| |
Item |
Status |
Action |
Next Report |
| 1 |
Requirements |
see below |
|
|
| 2 |
Detector BCS |
|
|
9/30/05 |
| 3 |
Detector Packaging |
|
|
|
| 4 |
NOTES/I&T |
|
Warm NOTES? mtg 9/28 1100 |
|
| 5 |
Filter Wheel Accuracy |
allowing retries may solve problem |
|
|
|
Document Status
| DRD |
Title |
Status |
Due |
Comments |
| SE-04 |
Verification Plan |
Rejected |
7/27/05 |
|
| IT-01 |
I&T Plan |
Rejected |
tbd |
On hold for resolution of NOTES testing plan. |
| SA-14 |
Safety Plan |
Review & Comment |
8/15/05 |
Delivered 7/29/05 |
|
Pending Changes
| Mod |
Mod Descr |
CCR # |
RTC# |
Description |
Cost/No |
Status |
Due |
Comments |
ECD |
| tbd |
3-mo schedule slip |
|
|
3-Month Schedule Slip |
Yes |
mod |
|
|
|
| tbd |
Wave 4 |
|
|
Wave 4 Changes |
yes |
RFP |
10/3/05 |
|
|
| |
|
239 |
|
NIRCam SOW Rev D |
yes |
Complete |
|
ASIC |
|
| |
|
243/333 |
|
DRD Rev F/G |
yes |
Complete |
|
EEE Parts |
|
| |
|
164/235 |
|
DMGSER Rev -/A |
yes
|
Complete |
|
|
|
| tbd |
Launch Slip |
|
|
22-mo Launch Slip, 10-mo delivery slip |
|
RFP |
11/16/05 |
|
|
| |
|
334 |
|
10-month delivery slip |
yes |
Complete |
|
|
|
| |
|
361 |
|
22-mo launch slip |
yes |
Complete |
|
|
|
| tbd |
Wave 5 |
|
|
Wave 5 Changes |
yes |
|
|
|
|
| |
|
313 |
|
SOW Rev E (Test Changes) |
Yes |
Complete |
|
|
|
| |
|
339 |
|
MAR Rev B |
Yes |
Complete |
|
Adds S/W QA |
|
| |
|
312 |
|
ISIM Requirements Doc Rev A |
no |
Complete |
|
|
|
| |
|
364 |
|
MICD EO# 1, 2, 3 |
No |
comment |
9/27/05 |
|
|
| |
|
tbd |
|
NIRCam Spec Rev C |
|
Loop 1 |
|
|
|
| |
|
tbd |
|
IRD Rev D |
|
Draft |
9/30/05 |
|
|
| |
|
|
001D |
Synchronization |
Yes |
complete |
|
|
|
| |
|
|
008F |
Thermal |
|
complete |
|
|
|
| |
|
|
014C |
Stray Light |
|
complete |
|
|
|
| |
|
|
015D |
I&T Test Aids |
|
Loop 1 |
|
Davila/Hagopian |
|
| |
|
|
017C |
On Orbit Sine |
|
complete |
|
|
|
| |
|
|
018A |
Radiative Heat Transfer |
|
complete |
|
|
|
| |
|
|
025B |
PIL Distortion |
|
complete |
|
|
|
| |
|
|
026D |
Mechanisms |
|
complete |
|
|
|
| |
|
|
028F |
ASIC |
|
complete |
|
|
|
| |
|
|
029B |
I&T Test Aids |
|
complete |
|
|
|
| |
|
|
031A |
PIL Source Location |
|
complete |
|
|
|
| |
|
|
032C |
WFS&C |
|
complete |
|
|
|
| |
|
|
033A |
Electrical TBRs |
|
Loop 2 |
9/30 |
|
|
| |
|
|
034A |
Outgassing Rate |
|
Loop 1 |
9/27 |
|
|
| |
|
|
035A |
PIL WFE |
|
complete |
|
|
|
| |
|
|
037A |
FPA Isolation |
|
complete |
|
|
|
| |
|
|
038A |
ICE Harness Mass |
|
Loop 1 |
|
mtg 9/20 |
|
| |
|
|
041A |
Radiation |
|
Loop 1 |
9/16/05 |
comments late |
|
| |
|
|
042A |
Optical Cubes |
|
complete |
|
|
|
| |
|
|
043A |
Heater Voltage & Power |
|
Loop 1 |
9/23/05 |
Stu & Julie |
|
| |
|
|
044A |
Cryo Metrology |
|
Loop 1 |
|
mtg 9/27 |
|
| |
|
|
045A |
WFS&C #2 |
|
complete |
|
|
|
| |
|
|
046A |
EMC #2 |
|
complete |
|
|
|
| |
|
|
047A |
WFS&C #3 |
|
complete |
|
|
|
| |
|
|
048A |
Optical Alignment |
|
Loop 1 |
|
mtg 9/27 |
|
| |
|
|
051A |
Thermal #2 |
|
Loop 1 |
9/23 |
Stu & Julie |
|
| |
|
|
053A |
Electrical TBXs #2 |
|
Loop 2 |
9/30 |
|
|
| |
|
|
054A |
Stray Light #2 |
|
Loop 1 |
9/2/05 |
D. Kelly |
|
| tbd |
tbd |
tbd |
|
IRD Rev E |
|
|
11/30/05 |
|
|
| |
|
|
030A |
FSW Telemetry Rate |
|
Loop 1 |
9/21/05 |
Aguilar |
|
| |
|
|
036A |
Structural Interface Load |
|
Loop 1 |
|
|
|
| |
|
|
049A |
Handling Procedures |
|
Loop 1 |
|
|
|
| |
|
|
050A |
WFS&C #4 |
|
Loop 1 |
|
|
|
| |
|
|
052A |
Moving Target |
|
Loop 2 |
|
|
|
| |
|
|
055A |
FSW Changes for ASIC |
|
Loop 2 |
9/21 |
|
|
|
NIRCam Needs
| Need |
Status |
ECD |
Assigned |
|
| Resolve TBXs in NIRCam Reqts Documents |
See "Pending Changes" above. |
7/31/05 TBR |
Lundquist |
|
| MICD EO 4 & additional envelope for baffle |
Draft |
|
|
|
| NIRCam Drill template to Axsys |
|
10/15/05 |
Crow |
|
| Cryo refractive index measurements of Si, Fused Silica |
|
|
Leviton |
|
| ASIC Ops Concept & interface documents |
ops concept out for review |
|
Dutta |
|
| Spacewire ICD & Spec |
|
|
Aguilar |
|
| Loads update for OBA/ISIM brackets |
Delivered to Alison on 8/18 |
|
Crow |
|
| Loads from harness/thermal straps |
|
|
Crow |
|
| Info on ground strap, if any |
|
|
McCloskey |
|
| SIDU Upgrade for ASIC |
|
|
Guy |
|
|