NIRCam News
September 19 , 2005
Previous editions are available in the archive.
|
Tuesday Telecon
Tuesday, September 20, 1600 EDT
Goddard Location: 22/C399
Dial in information: 877-951-3250, Passcode 108321
Agenda: Discuss NIRCam participation in ISIM Harness PDR
RTC 038 ICE Harness Mass
RTC 033A Electrical TBRs
RTC 053A Electrical TBxs #2
|
NIRCam Calendar
| Date |
Event |
Details |
| 9/21/05 |
NIRCam Monthly |
GSFC (0900 EDT)
22/C398
|
| 9/22-23/05 |
JWST SWG |
STScI |
| 9/30/05 |
Detector BCS Failure Status Review |
Camarillo, CA |
| 10/5/05 |
ETU Stray Light/Baffle CDR
(date may change)
|
Palo Alto, CA |
| 10/6/05 |
FPA Housing CDR
(date may change)
|
Palo Alto, CA |
| TBA |
I&T CDR |
Palo Alto, CA |
| TBA |
GSE CDR |
Palo Alto, CA |
| 10/11-12/05 |
Optics Summit |
Greenbelt, MD ECO |
| 10/19/05 |
OTM (aka STOP) Analysis TIM |
Palo Alto, CA |
| 10/18/05 |
NIRCam Monthly |
Palo Alto, CA |
| 10/25-26/05 |
ISIM EMC Summit |
GSFC |
| 10/27/2005 |
ISIM Harness PDR |
GSFC |
| early Nov |
Detector BCS Status |
Camarillo, CA |
| mid-Nov |
ICE CDR |
Palo Alto, CA |
| mid-Dec |
FPE CDR |
Palo Alto, CA |
| TBA |
FSW PDR |
Palo Alto, CA |
|
Last Week's Accomplishments
1) Arizona clean room refurbishment was completed with
the refinishing of the floor. Monitoring of particulates, etc.,
to begin shortly.
2) T. Magoncelli has used his prototype ASIC control card to
download microcode to an ASIC and use the microcode to operate
a set of LEDs for visual confirmation that the process succeeded.
3) Preparing for a manufacturing readiness review of ETU lenses.
|
Announcements
The full-scale JWST model will be visiting GSFC 9/21-9/26. A JWST group photo will be taken on 9/21 at 3 pm.
|
NIRCam Top 5
| |
Item |
Status |
Action |
Next Report |
| 1 |
Requirements |
see below |
|
|
| 2 |
Detector BCS |
|
|
9/30/05 |
| 3 |
Detector Packaging |
|
|
8/10/05
|
| 4 |
NOTES/I&T |
|
schedule Independent Review |
|
| 5 |
Filter Wheel Accuracy |
allowing retries may solve problem |
|
|
|
Document Status
| DRD |
Title |
Status |
Due |
Comments |
| SE-04 |
Verification Plan |
Rejected |
7/27/05 |
|
| IT-01 |
I&T Plan |
Rejected |
tbd |
On hold for resolution of NOTES testing plan. |
| SA-14 |
Safety Plan |
Review & Comment |
8/15/05 |
Delivered 7/29/05 |
|
Pending Changes
| Mod |
Mod Descr |
CCR # |
RTC# |
Description |
Cost/No |
Status |
Due |
Comments |
ECD |
| tbd |
3-mo schedule slip |
|
|
3-Month Schedule Slip |
Yes |
negotiations |
9/21/05 |
|
|
| tbd |
Wave 4 |
|
|
Wave 4 Changes |
yes |
RFP |
10/3/05 |
|
|
| |
|
239 |
|
NIRCam SOW Rev D |
yes |
Complete |
|
ASIC |
|
| |
|
243/333 |
|
DRD Rev F/G |
yes |
Complete |
|
EEE Parts |
|
| |
|
164/235 |
|
DMGSER Rev -/A |
yes
|
Complete |
|
|
|
| tbd |
Launch Slip |
|
|
22-mo Launch Slip, 10-mo delivery slip |
|
RFP |
11/16/05 |
|
|
| |
|
334 |
|
10-month delivery slip |
yes |
Complete |
|
|
|
| |
|
361 |
|
22-mo launch slip |
yes |
Complete |
|
|
|
| tbd |
Wave 5 |
|
|
Wave 5 Changes |
yes |
|
|
|
|
| |
|
313 |
|
SOW Rev E (Test Changes) |
Yes |
Complete |
|
|
|
| |
|
339 |
|
MAR Rev B |
Yes |
Complete |
|
Adds S/W QA |
|
| |
|
312 |
|
ISIM Requirements Doc Rev A |
no |
Complete |
|
|
|
| |
|
tbd |
|
Mechanical ICD thru EO2 |
no |
CCR |
9/23/05 |
|
|
| |
|
tbd |
|
Mechanical ICD EO3 |
yes |
Loop 1 |
|
L1 released 9/1 |
|
| |
|
tbd |
|
NIRCam Spec Rev C |
|
Loop 1 |
|
|
|
| |
|
tbd |
|
IRD Rev D |
|
Draft |
9/30/05 |
|
|
| |
|
|
001D |
Synchronization |
Yes |
complete |
|
|
|
| |
|
|
008F |
Thermal |
|
complete |
|
|
|
| |
|
|
014C |
Stray Light |
|
Loop 2 |
9/23/05 |
|
|
| |
|
|
015D |
I&T Test Aids |
|
Loop 1 |
|
mtg 9/27 |
|
| |
|
|
017C |
On Orbit Sine |
|
complete |
|
|
|
| |
|
|
018A |
Radiative Heat Transfer |
|
complete |
|
|
|
| |
|
|
025B |
PIL Distortion |
|
complete |
|
|
|
| |
|
|
026D |
Mechanisms |
|
complete |
|
|
|
| |
|
|
028F |
ASIC |
|
complete |
|
|
|
| |
|
|
029B |
I&T Test Aids |
|
complete |
|
|
|
| |
|
|
031A |
PIL Source Location |
|
complete |
|
|
|
| |
|
|
032C |
WFS&C |
|
complete |
|
|
|
| |
|
|
033A |
Electrical TBRs |
|
Loop 1 |
9/16 |
|
|
| |
|
|
034A |
Outgassing Rate |
|
Loop 1 |
9/27 |
draft out 9/19 |
|
| |
|
|
035A |
PIL WFE |
|
complete |
|
|
|
| |
|
|
037A |
FPA Isolation |
|
Loop 2 |
9/23 |
|
|
| |
|
|
038A |
ICE Harness Mass |
|
Loop 1 |
|
mtg 9/20 |
|
| |
|
|
041A |
Radiation |
|
Loop 1 |
9/16/05 |
comments late |
|
| |
|
|
042A |
Optical Cubes |
|
complete |
|
|
|
| |
|
|
043A |
Heater Voltage & Power |
|
Loop 1 |
9/23/05 |
Stu & Julie |
|
| |
|
|
044A |
Cryo Metrology |
|
Loop 1 |
|
mtg 9/27 |
|
| |
|
|
045A |
WFS&C #2 |
|
Loop 1 |
|
mtg 9/27 |
|
| |
|
|
046A |
EMC #2 |
|
complete |
|
|
|
| |
|
|
047A |
WFS&C #3 |
|
Loop 1 |
|
mtg 9/27 |
|
| |
|
|
048A |
Optical Alignment |
|
Loop 1 |
|
mtg 9/27 |
|
| |
|
|
051A |
Thermal #2 |
|
Loop 1 |
9/23 |
Stu & Julie |
|
| |
|
|
053A |
Electrical TBXs #2 |
|
Loop 1 |
L1 9/7 |
mtg 9/20 |
|
| |
|
|
054A |
Stray Light #2 |
|
Loop 1 |
9/2/05 |
D. Kelly |
|
| tbd |
tbd |
tbd |
|
IRD Rev E |
|
|
11/30/05 |
|
|
| |
|
|
030A |
FSW Telemetry Rate |
|
Loop 1 |
9/21/05 |
Aguilar |
|
| |
|
|
036A |
Structural Interface Load |
|
Loop 1 |
|
|
|
| |
|
|
049A |
Handling Procedures |
|
Loop 1 |
|
|
|
| |
|
|
050A |
WFS&C #4 |
|
Loop 1 |
|
|
|
| |
|
|
052A |
Moving Target |
|
Loop 2 |
|
|
|
| |
|
|
055A |
FSW Changes for ASIC |
|
Loop 2 |
9/21 |
|
|
|
NIRCam Needs
| Need |
Status |
ECD |
Assigned |
|
| Requirements Baseline by July 31 |
See "Pending Changes" above. |
7/31/05 TBR |
Lundquist |
|
| Mechanical ICD EO2 release |
EO1 & EO2 |
7/26/05 |
Crow |
|
| ASIC Ops Concept & interface documents |
ops concept out for review |
|
Dutta |
|
| Loads update for OBA/ISIM brackets |
Delivered to Alison on 8/18 |
|
Crow |
|
| Loads from harness/thermal straps |
|
|
Crow |
|
| Info on ground strap, if any |
|
|
McCloskey |
|
|
NIRCam TBD/TBR Progress & Plan

|
|
|
|