Agenda: Discuss NIRCam participation in ISIM Harness PDR
RTC 038 ICE Harness Mass
RTC 033A Electrical TBRs
RTC 053A Electrical TBxs #2


NIRCam Calendar
Date Event Details
9/21/05 NIRCam Monthly

GSFC (0900 EDT)
22/C398

9/22-23/05 JWST SWG STScI
9/30/05 Detector BCS Failure Status Review Camarillo, CA
10/5/05

ETU Stray Light/Baffle CDR
(date may change)

Palo Alto, CA
10/6/05

FPA Housing CDR
(date may change)

Palo Alto, CA
TBA I&T CDR Palo Alto, CA
TBA GSE CDR Palo Alto, CA
10/11-12/05 Optics Summit Greenbelt, MD ECO
10/19/05 OTM (aka STOP) Analysis TIM Palo Alto, CA
10/18/05 NIRCam Monthly Palo Alto, CA
10/25-26/05 ISIM EMC Summit GSFC
10/27/2005 ISIM Harness PDR GSFC
early Nov Detector BCS Status Camarillo, CA
mid-Nov ICE CDR Palo Alto, CA
mid-Dec FPE CDR Palo Alto, CA
TBA FSW PDR Palo Alto, CA

Last Week's Accomplishments

1) Arizona clean room refurbishment was completed with
the refinishing of the floor. Monitoring of particulates, etc.,
to begin shortly.
2) T. Magoncelli has used his prototype ASIC control card to
download microcode to an ASIC and use the microcode to operate
a set of LEDs for visual confirmation that the process succeeded.
3) Preparing for a manufacturing readiness review of ETU lenses.

Announcements

The full-scale JWST model will be visiting GSFC 9/21-9/26. A JWST group photo will be taken on 9/21 at 3 pm.

 

NIRCam Top 5
  Item Status Action Next Report
1 Requirements see below    
2 Detector BCS     9/30/05
3 Detector Packaging    

8/10/05

4 NOTES/I&T   schedule Independent Review  
5 Filter Wheel Accuracy allowing retries may solve problem    
Document Status
DRD Title Status Due Comments
SE-04 Verification Plan Rejected 7/27/05  
IT-01 I&T Plan Rejected tbd On hold for resolution of NOTES testing plan.
SA-14 Safety Plan Review & Comment 8/15/05 Delivered 7/29/05
Pending Changes
Mod Mod Descr CCR # RTC# Description Cost/No Status Due Comments ECD
tbd 3-mo schedule slip     3-Month Schedule Slip Yes negotiations 9/21/05    
tbd Wave 4     Wave 4 Changes yes RFP 10/3/05    
    239   NIRCam SOW Rev D yes Complete   ASIC  
    243/333   DRD Rev F/G yes Complete   EEE Parts  
    164/235   DMGSER Rev -/A

yes

Complete      
tbd Launch Slip     22-mo Launch Slip, 10-mo delivery slip   RFP 11/16/05    
    334   10-month delivery slip yes Complete      
    361   22-mo launch slip yes Complete      
tbd Wave 5     Wave 5 Changes yes        
    313   SOW Rev E (Test Changes) Yes Complete      
    339   MAR Rev B Yes Complete   Adds S/W QA  
    312   ISIM Requirements Doc Rev A no Complete      
    tbd   Mechanical ICD thru EO2 no CCR 9/23/05    
    tbd   Mechanical ICD EO3 yes Loop 1   L1 released 9/1  
    tbd   NIRCam Spec Rev C   Loop 1      
    tbd   IRD Rev D   Draft 9/30/05    
      001D Synchronization Yes complete      
      008F Thermal   complete      
      014C Stray Light   Loop 2 9/23/05    
      015D I&T Test Aids   Loop 1   mtg 9/27  
      017C On Orbit Sine   complete      
      018A Radiative Heat Transfer   complete      
      025B PIL Distortion   complete      
      026D Mechanisms   complete      
      028F ASIC   complete      
      029B I&T Test Aids   complete      
      031A PIL Source Location   complete      
      032C WFS&C   complete      
      033A Electrical TBRs   Loop 1 9/16    
      034A Outgassing Rate   Loop 1 9/27 draft out 9/19  
      035A PIL WFE   complete      
      037A FPA Isolation   Loop 2 9/23    
      038A ICE Harness Mass   Loop 1   mtg 9/20  
      041A Radiation   Loop 1 9/16/05 comments late  
      042A Optical Cubes   complete      
      043A Heater Voltage & Power   Loop 1 9/23/05 Stu & Julie  
      044A Cryo Metrology   Loop 1   mtg 9/27  
      045A WFS&C #2   Loop 1   mtg 9/27  
      046A EMC #2   complete      
      047A WFS&C #3   Loop 1   mtg 9/27  
      048A Optical Alignment   Loop 1   mtg 9/27  
      051A Thermal #2   Loop 1 9/23 Stu & Julie  
      053A Electrical TBXs #2   Loop 1 L1 9/7 mtg 9/20  
      054A Stray Light #2   Loop 1 9/2/05 D. Kelly  
tbd tbd tbd   IRD Rev E     11/30/05    
      030A FSW Telemetry Rate   Loop 1 9/21/05 Aguilar  
      036A Structural Interface Load   Loop 1      
      049A Handling Procedures   Loop 1      
      050A WFS&C #4   Loop 1      
      052A Moving Target   Loop 2      
      055A FSW Changes for ASIC   Loop 2 9/21    
NIRCam Needs
Need Status ECD Assigned  
Requirements Baseline by July 31 See "Pending Changes" above. 7/31/05 TBR Lundquist  
Mechanical ICD EO2 release EO1 & EO2 7/26/05 Crow  
ASIC Ops Concept & interface documents ops concept out for review   Dutta  
Loads update for OBA/ISIM brackets Delivered to Alison on 8/18   Crow  
Loads from harness/thermal straps     Crow  
Info on ground strap, if any     McCloskey  

NIRCam TBD/TBR Progress & Plan