NIRCam News
September 6 , 2005
Previous editions are available in the archive.
|
Tuesday Telecon
Tuesday, September 6, 1600 EDT
Goddard Location: 22/C399
Dial in information: 877-951-3250, Passcode 108321
Agenda: RTCs 045 & 047 (WFS&C), and 048 (optical alignment)
|
NIRCam Calendar
| Date |
Event |
Details |
| 9/6/05 |
WFS&C RTCs Mtg (045,047,048) |
1600 EDT |
| 9/8/05 |
Optics RTC Mtg (015, 044) |
1300 EDT |
| 9/8/05 |
Stray Light RTC Mtg (014,054) |
1600 EDT |
| 9/21/05 |
NIRCam Monthly |
GSFC |
| 9/22-23/05 |
JWST SWG |
STScI |
| 9/27/05 |
ICE CDR |
Palo Alto, CA |
| 9/28/05 |
FPE CDR |
Palo Alto, CA |
| 9/29/05 |
FSW CDR |
Palo Alto, CA |
| 9/30/05 |
Detector BCS Failure Closure Review |
Camarillo, CA |
| 10/5/05 |
ETU Stray Light/Baffle CDR |
Palo Alto, CA |
| 10/6/05 |
FPA Housing CDR |
Palo Alto, CA |
| 10/4/05 |
I&T CDR |
Palo Alto, CA |
| 10/5-6/05 |
GSE CDR |
Palo Alto, CA |
| 10/11-12/05 |
Optics Summit |
Greenbelt, MD ECO |
| 10/25-26/05 |
ISIM EMC Summit |
GSFC |
| 10/27/2005 |
ISIM Harness TIM |
GSFC |
|
Last Week's Accomplishments
NIRCam Activities for Week Ending 8/30/05
1) Held a review of SCA acceptance testing
procedures at Rockwell.
2) LM ATC, Az, and GSFC folks worked hard to
organize the numerous RTCs and TBXs so these
can be finished in a timely manner.
3) The ACE board for ASIC prototype testing is
complete and initial tests are underway.
4) FSW has completed the design and coding of
the NIRCAM ICE control module and is now checking
it out against an ICE simulator.
|
Announcements
The charts from the NIRCam monthly (8/25/2005) are available on NGIN as JWST-RPT-005462.
|
NIRCam Top 5
| |
Item |
Status |
Action |
Next Report |
| 1 |
FY06 Funding |
detailed replan for $24M/10 mo case in work |
CCR for 10 month slip in work |
|
| 2 |
Requirements |
See below - stray light is particular emphasis |
|
|
| 3 |
Detector Packaging |
|
|
|
| 4 |
Detector BCS Failure |
|
|
8/10/05
|
| 5 |
Filter Wheel Accuracy |
|
|
|
|
Document Status
| DRD |
Title |
Status |
Due |
Comments |
| SE-04 |
Verification Plan |
Rejected |
7/27/05 |
|
| IT-01 |
I&T Plan |
Rejected |
tbd |
On hold for resolution of NOTES testing plan. |
| SA-14 |
Safety Plan |
Review & Comment |
8/15/05 |
Delivered 7/29/05 |
|
Pending Changes
| Mod |
Mod Descr |
CCR # |
RTC# |
Description |
Cost/No |
Status |
Due |
Comments |
ECD |
| tbd |
3-mo schedule slip |
|
|
3-Month Schedule Slip |
Yes |
pre-neg |
|
|
|
| tbd |
Wave 4 |
|
|
Wave 4 Changes |
yes |
RELEASED |
10/3/05 |
|
|
| |
|
239 |
|
NIRCam SOW Rev D |
yes |
Complete |
|
ASIC |
|
| |
|
243/333 |
|
DRD Rev F/G |
yes |
Complete |
|
EEE Parts |
|
| |
|
164/235 |
|
DMGSER Rev -/A |
yes
|
Complete |
|
|
|
| 25 |
Wv 5 No Cost |
|
|
Wave 5 No Cost Changes |
no |
Complete |
8/31/2005 |
|
|
| |
|
332 |
|
DILS Rev G |
no |
complete |
|
adds EEE parts |
|
| |
|
320 |
|
IRD Rev C |
no |
complete |
|
|
|
| tbd |
Wave 5 |
|
|
Wave 5 Changes |
yes |
|
|
|
|
| |
|
334 |
|
10 month Schedule Slip |
yes |
CCB |
8/17/05 |
|
|
| |
|
313 |
|
SOW Rev E (Test Changes) |
Yes |
Complete |
|
|
|
| |
|
339 |
|
MAR Rev B |
Yes |
Draft |
|
Adds S/W QA |
|
| |
|
312 |
|
ISIM Requirements Doc Rev A |
no |
Complete |
|
|
|
| |
|
tbd |
|
Mechanical ICD thru EO2 |
no |
draft |
9/2/2005 |
J. Abell |
|
| |
|
tbd |
|
Mechanical ICD EO3 |
yes |
Loop 1 |
|
L1 released 9/1 |
|
| |
|
tbd |
|
NIRCam Spec Rev C |
|
Loop 1 |
|
|
|
| |
|
tbd |
|
IRD Rev D |
|
Draft |
9/30/05 |
|
|
| |
|
|
001C |
Synchronization |
Yes |
complete |
|
|
|
| |
|
|
008D |
Thermal |
|
complete |
|
|
|
| |
|
|
014 |
Stray Light |
|
Loop 1 |
L1 9/2 |
Mtg on 9/8 |
|
| |
|
|
015D |
I&T Test Aids |
|
Loop 1 |
|
Mtg on 9/8 |
|
| |
|
|
017A |
On Orbit Sine |
|
complete |
|
|
|
| |
|
|
018A |
Radiative Heat Transfer |
|
complete |
|
|
|
| |
|
|
025B |
PIL Distortion |
|
complete |
|
|
|
| |
|
|
026D |
Mechanisms |
|
complete |
|
|
|
| |
|
|
028B |
ASIC |
|
complete |
|
|
|
| |
|
|
029B |
I&T Test Aids |
|
complete |
|
|
|
| |
|
|
031A |
PIL Source Location |
|
complete |
|
|
|
| |
|
|
032C |
WFS&C |
|
complete |
|
|
|
| |
|
|
033A |
Electrical TBRs |
|
Loop 1 |
L1 9/2 |
|
|
| |
|
|
034A |
Outgassing Rate |
|
Loop 1 |
L1 9/7 |
|
|
| |
|
|
035A |
PIL WFE |
|
complete |
|
|
|
| |
|
|
037A |
FPA Isolation |
|
Loop 1 |
L1 9/2 |
|
|
| |
|
|
038A |
ICE Harness Mass |
|
Loop 1 |
L1 9/8 |
|
|
| |
|
|
041A |
Radiation |
|
Loop 1 |
9/16/05 |
L1 released 9/2 |
|
| |
|
|
042A |
Optical Cubes |
|
complete |
|
|
|
| |
|
|
043A |
Heater Voltage & Power |
|
Loop 1 |
L1 9/7 |
|
|
| |
|
|
044A |
Cryo Metrology |
|
Loop 1 |
L1 released |
Mtg on 9/8 |
|
| |
|
|
045A |
WFS&C #2 |
|
Loop 2 |
L2 released |
Mtg on 9/6 |
|
| |
|
|
046C |
EMC #2 |
|
Loop 2 |
L2 released |
|
|
| |
|
|
047A |
WFS&C #3 |
|
Loop 2 |
L2 released |
Mtg on 9/6 |
|
| |
|
|
048A |
Optical TBXs |
|
Loop 1 |
L1 released |
mtg on 9/13 |
|
| |
|
|
049A |
Handling Procedures |
|
Loop 1 |
L1 9/2 |
|
|
| |
|
|
051A |
Thermal #2 |
|
Loop 1 |
L1 9/7 |
|
|
| |
|
|
053A |
Electrical TBXs #2 |
|
Loop 1 |
L1 9/7 |
|
|
| |
|
|
054A |
Stray Light #2 |
|
Loop 1 |
L1 9/2 |
D. Kelly |
|
| tbd |
tbd |
tbd |
|
IRD Rev E |
|
|
11/30/05 |
|
|
| |
|
|
030A |
FSW Telemetry Rate |
|
Loop 1 |
|
|
|
| |
|
|
036A |
Structural Interface Load |
|
Loop 1 |
|
|
|
| |
|
|
050A |
WFS&C #4 |
|
Loop 1 |
|
|
|
| |
|
|
052A |
Moving Target |
|
Loop 2 |
|
|
|
| |
|
|
055A |
FSW Changes for ASIC |
|
draft |
|
|
|
|
NIRCam Needs
| Need |
Status |
ECD |
Assigned |
|
| Requirements Baseline by July 31 |
See "Pending Changes" above. |
7/31/05 TBR |
Lundquist |
|
| Mechanical ICD EO2 release |
EO1 & EO2 |
7/26/05 |
Crow |
|
| ASIC Ops Concept & interface documents |
ops concept out for review |
|
Dutta |
|
| Additional SWTS for SIDU+ #2 |
Jamie Dunn says ok. Need date? |
|
Campbell |
|
| Loads update for OBA/ISIM brackets |
Delivered to Alison on 8/18 |
|
Crow |
|
| Loads from harness/thermal straps |
|
|
Crow |
|
| Info on ground strap, if any |
|
|
McCloskey |
|
|
NIRCam TBD/TBR Progress & Plan

|
|
|
|