NIRCam News
September 4, 2007
Previous editions are available in the archive.

 

 

Tuesday Telecon

Dial-in: 877-951-3250, Passcode 108321

Date

Meeting Agenda

GSFC Location

Sept 4, 2007, 4pm EDT
ISIM FSW simulators  
Harness mockup planning
Bld 22 rm 399A

Sept 11, 2007, 4pm EDT

TBD

 

 

Announcements

Other Telecons

NIRCam Bench trade Sept 5, 2007,1 pm EDT Discuss trade matrix
NIRCam Alignment Tiger Team meeting Sept 6, 2007, 2 pm EDT  
     

 

NIRCam Calendar

 

Date

Event

Details

Sept 18, 2007

NIRCam Strut TIM

Palo Alto. This will begin at 11:30 am EDT, GSFC location is bld 22 rm 399. Videocon will be used.

Sept 18, 2007

NIRCam Monthly

Palo Alto, will start at 4pm EDT (1pm PDT)

Sept 24-27, 2007

JWST Science Mtg

Tucson

Oct 18, 2007

NIRCam Monthly

Palo Alto

Oct 23-24, 2007 JWST SWG Meeting STScI
Nov 6-8, 2007

JWST Partners Workshop

Maryland
Nov 27-29, 2007

OTE PDR

NGST?
Dec 4-5, 2007 IOTA-ISIM Optical Test Audit NGST ECO

Dec 12, 2007

NIRCam Monthly

Palo Alto

 

  Accomplishments for Week Ending 8/28/07

1) Cracks in SCA moly plates machined at Arizona
were discovered by Teledyne. Other plates still
at Arizona were cryo cycled and inspected with no
cracks found so these will be sent to Teledyne.
2) The crosshair portion of the Pathfinder test is
complete after additional warm tests were performed to
check for mechanical "play" in the bench attachments.
A small revision in the cams will be made.
3) Larry Burriesci has retired, and Alison Nordt has
returned and will take his place as the Instrument IPT.
4) Analyses in support of OTE and WFS Team requests are
underway.

 

Document Status (needs updating)

DRD

Title

Status

Due

Comments

SA-02

Contamination Control Plan

Under Review

See JWST-MEMO-6835, requested

for resubmittal last June.

SE-04

Verification Plan

GSFC Review

3/6/2007

 

SE-10

Math Models

Returned with comments

11/8/2006

See JWST-MEMO-7015 regarding mechanical models only, partially

rejected in August with requested resubmittal in 90 days.

PM-01

Project Management Plan

Under Review

 

FSW-01

FSW Product Plan

needs update

 

See JWST-MEMO-4063

FSW-02

FSW Vision Doc

needs update

 

See-JWST-MEMO-4210

FSW-03

FSW Reqts Spec

returned w/ comments

1/9/2007

Accepted with comments in mid-November with a requested update due in

60 days (mid-January)

OPS-11

Ops Concept

needs update

 

See JWST-MEMO-4518

 

 

Pending Changes (needs updating)

Mod

CCR #

RTC#

Description

Cost

Status

Due

Comments

 

 

 

 

 

 

 

ISIM Level NIRCam Risks (needs updating)

Number

Title

Impact

Likelihood

Rating

NIRCam-32

NIRCam Lens Mounts

C

A

Low

NIRCam-138

NIRCam Wavefront Error (low/mid/high sf)

D

B

Medium

NIRCam-143

NIRCam Optical Transmission

C

B

Low

NIRCam-191

NIRCam Detector BCS Failures

C

A

Low

NIRCam-250

NIRCam Region 1 Heat Transfer

B

C

Medium

NIRCam-251

NIRCam Optical Alignment

C

B

Low

NIRCam -280

Extra Module-level cryotest with FPAs integrated

 

 

 

 

 

 

Acronym List

ASIC

Application-Specific Integrated Circuit

ASMIF

Ambient Science Instrument Mechanical Interface Fixture

BCS

Balance Composite Structure

CCDH

Common Command & Data Handling

CMLB

Ceramic Multi-Layer Board

CPT

Comprehensive Performance Test

DBS

Dichroic Beam Splitter

DHS

Dispersed Hartmann Sensor

EEE

Electrical, Electronic, and Electromechanical (Parts)

EOL

End-of-life

ETU

Engineering Test Unit

FOV

Field of View

FPA

Focal Plane Assembly

FPE

Focal Plane Electronics

FSW

Flight Software

GSFC

Goddard Space Flight Center

GSE

Ground Support Equipment

I&T

Integration & Test

ICD

Interface Control Document

ICE

Instrument Control Electronics

ICP

Interconnect Panel

IRD

Interface Requirements Document

IOS

ISIM-to-OTE-and-Spacecraft

ISIM

Integrated Science Instrument Module

KM

Kinematic Mount

MIPS

Million Instructions Per Second

MRR

Manufacturing Readiness Review

NGIN

Next Generation Integrated Network

OA

Optics Assembly

OBA

Optical Bench Assy

OOB

Out of Band

OTE

Optical Telescope Element

PAR

Pupil Alignment Reference

PDR

Preliminary Design Review

PFD

Passive Friction Device

PIL

Pupil Imaging Lens

PSD

Power Spectral Density

RFA

Request for Action

RTC

Request for Technical Coordination

Rx

Prescription

SCA

Sensor Chip Assembly

SOW

Statement of Work

STOP

Structural, Thermal, Optical (Analysis)

SWG

Science Working Group

TBR

To Be Reviewed

TIMs

Technical Interchange Meeting

T-NAR

Technology Non-Advocate Review

TV

Thermal Vacuum

UPS

Uninterruptible Power Supply

WFE

Wavefront Error

WFS

Wavefront Sensing