NIRCam Calendar
| Date |
Event |
Details |
| 10/11-12/05 |
Optics Summit |
Greenbelt, MD (ECO) |
| 9/6/05 |
Optical I&T RTCs Mtg |
1600 EDT |
| 9/8/05 |
Stray Light/Optics RTC Mtg |
TBA |
| 9/20/05 |
NIRCam Monthly |
GSFC |
| 9/21-22/05 |
JWST SWG |
STScI |
| 9/27/05 |
ICE CDR |
Palo Alto, CA |
| 9/28/05 |
FPE CDR |
Palo Alto, CA |
| 9/29/05 |
FSW CDR |
Palo Alto, CA |
| 9/30/05 (TBR) |
Detector BCS Failure Closure Review |
Camarillo, CA |
| 10/5/05 |
ETU Stray Light/Baffle CDR |
Palo Alto, CA |
| 10/6/05 |
FPA Housing CDR |
Palo Alto, CA |
| 10/4/05 |
I&T CDR |
Palo Alto, CA |
| 10/5-6/05 |
GSE CDR |
Palo Alto, CA |
| 10/25-26/05 |
ISIM EMC Summit |
GSFC |
| 10/27/2005 |
ISIM Harness TIM |
GSFC |
|
Last Week's Accomplishments
NIRCam Activities for Week Ending 8/24/2005
1) Received first DHAS at Arizona.
2) Cryocycling and testing of prototype POM complete. No
"quilting" observed at operational temps, and WFE is better
than required. ETU Pickoff Mirror delivered.
3) Be Bench machining is progressing well with required tolerances
being met easily.
4) Reviewed PIL optical design with WFS team via telecon.
|
Announcements
The charts from the NIRCam monthly (8/25/2005) are available on NGIN as JWST-RPT-005462.
|
NIRCam Top 5
| |
Item |
Status |
Action |
Next Report |
| 1 |
FY06 Funding |
detailed replan for $24M/10 mo case in work |
CCR for 10 month slip in work |
|
| 2 |
Requirements |
See below - stray light is particular emphasis |
|
|
| 3 |
Detector Packaging |
|
|
|
| 4 |
Detector BCS Failure |
|
|
8/10/05
|
| 5 |
Filter Wheel Accuracy |
|
|
|
|
Document Status
| DRD |
Title |
Status |
Due |
Comments |
| SE-04 |
Verification Plan |
Rejected |
7/27/05 |
|
| IT-01 |
I&T Plan |
Rejected |
tbd |
On hold for resolution of NOTES testing plan. |
| SA-14 |
Safety Plan |
Review & Comment |
8/15/05 |
Delivered 7/29/05 |
|
Pending Changes
| Mod |
Mod Descr |
CCR # |
RTC# |
Description |
Cost/No |
Status |
Due |
Comments |
ECD |
| tbd |
3-mo schedule slip |
|
|
3-Month Schedule Slip |
Yes |
pre-neg |
|
|
|
| tbd |
Wave 4 |
|
|
Wave 4 Changes |
yes |
RFP |
9/2/2005 |
|
|
| |
|
239 |
|
NIRCam SOW Rev D |
yes |
Complete |
|
ASIC |
|
| |
|
243/333 |
|
DRD Rev F/G |
yes |
Complete |
|
EEE Parts |
|
| |
|
164/235 |
|
DMGSER Rev -/A |
yes
|
Complete |
|
|
|
| tbd |
Wv 5 No Cost |
|
|
Wave 5 No Cost Changes |
no |
RFP |
9/15/2005 |
|
|
| |
|
332 |
|
DILS Rev G |
no |
complete |
|
adds EEE parts |
|
| |
|
320 |
|
IRD Rev C |
no |
complete |
|
|
|
| |
|
tbd |
|
Mechanical ICD thru EO2 |
no |
draft |
9/2/2005 |
J. Abell |
|
| |
|
tbd |
|
Mechanical ICD EO3 |
yes |
Loop 1 |
L1 9/2 |
G. Hobbs |
|
| tbd |
Wave 5 |
|
|
Wave 5 Changes |
yes |
|
|
|
|
| |
|
334 |
|
10 month Schedule Slip |
yes |
CCB |
8/17/05 |
|
|
| |
|
313 |
|
SOW Rev E (Test Changes) |
Yes |
Complete |
|
|
|
| |
|
339 |
|
MAR Rev B |
Yes |
Draft |
|
Adds S/W QA |
|
| |
|
312 |
|
ISIM Requirements Doc Rev A |
no |
Complete |
|
|
|
| |
|
tbd |
|
NIRCam Spec Rev C |
|
|
|
|
|
| |
|
tbd |
|
IRD Rev D |
|
Draft |
9/30/05 |
|
|
| |
|
|
001C |
Synchronization |
Yes |
complete |
|
|
|
| |
|
|
008D |
Thermal |
|
complete |
|
|
|
| |
|
|
014 |
Stray Light |
|
Loop 1 |
L1 9/2 |
Mtg on 9/8 |
|
| |
|
|
015C |
I&T Test Aids |
|
Loop 1 |
|
Mtg on 9/8 |
|
| |
|
|
017A |
On Orbit Sine |
|
complete |
|
|
|
| |
|
|
018A |
Radiative Heat Transfer |
|
complete |
|
|
|
| |
|
|
025B |
PIL Distortion |
|
complete |
|
|
|
| |
|
|
026D |
Mechanisms |
|
complete |
|
|
|
| |
|
|
028B |
ASIC |
|
complete |
|
|
|
| |
|
|
029B |
I&T Test Aids |
|
complete |
|
|
|
| |
|
|
031A |
PIL Source Location |
|
complete |
|
|
|
| |
|
|
032C |
WFS&C |
|
complete |
|
|
|
| |
|
|
033A |
Electrical TBRs |
|
Loop 1 |
L1 9/2 |
|
|
| |
|
|
034A |
Outgassing Rate |
|
Loop 1 |
L1 9/7 |
|
|
| |
|
|
035A |
PIL WFE |
|
complete |
|
|
|
| |
|
|
037A |
FPA Isolation |
|
Loop 1 |
L1 9/2 |
|
|
| |
|
|
038A |
ICE Harness Mass |
|
Loop 1 |
L1 9/8 |
|
|
| |
|
|
041A |
Radiation |
|
Loop 1 |
L1 9/9 |
Campbell |
|
| |
|
|
042A |
Optical Cubes |
|
complete |
|
|
|
| |
|
|
043A |
Heater Voltage & Power |
|
Loop 1 |
L1 9/7 |
|
|
| |
|
|
044A |
Cryo Metrology |
|
Loop 1 |
|
Mtg on 9/8 |
|
| |
|
|
045A |
WFS&C #2 |
|
Loop 2 |
|
Mtg on 9/6 |
|
| |
|
|
046A |
EMC #2 |
|
Loop 2 |
|
Need final info 9/2 |
|
| |
|
|
047A |
WFS&C #3 |
|
Loop 2 |
9/2 |
Mtg on 9/6 |
|
| |
|
|
048A |
Optical TBXs |
|
Loop 1 |
L1 9/2 |
|
|
| |
|
|
049A |
Handling Procedures |
|
Loop 1 |
L1 9/2 |
|
|
| |
|
|
051A |
Thermal #2 |
|
Loop 1 |
L1 9/7 |
|
|
| |
|
|
053A |
Electrical TBXs #2 |
|
Loop 1 |
L1 9/7 |
|
|
| |
|
|
054A |
Stray Light #2 |
|
Loop 1 |
L1 9/2 |
D. Kelly |
|
| tbd |
tbd |
tbd |
|
IRD Rev E |
|
|
11/30/05 |
|
|
| |
|
|
030A |
FSW Telemetry Rate |
|
Loop 1 |
|
|
|
| |
|
|
036A |
Structural Interface Load |
|
Loop 1 |
|
|
|
| |
|
|
050A |
WFS&C #4 |
|
Loop 1 |
|
|
|
| |
|
|
052A |
Moving Target |
|
Loop 2 |
|
|
|
| |
|
|
055A |
FSW Changes for ASIC |
|
draft |
|
|
|
|
NIRCam Needs
| Need |
Status |
ECD |
Assigned |
|
| Requirements Baseline by July 31 |
See "Pending Changes" above. |
7/31/05 TBR |
Lundquist |
|
| Mechanical ICD EO2 release |
EO1 & EO2 |
7/26/05 |
Crow |
|
| ASIC Ops Concept & interface documents |
ops concept out for review |
|
Dutta |
|
| Additional SWTS for SIDU+ #2 |
Jamie Dunn says ok. Need date? |
|
Campbell |
|
| Loads update for OBA/ISIM brackets |
Delivered to Alison on 8/18 |
|
Crow |
|
| Loads from harness/thermal straps |
|
|
Crow |
|
| Info on ground strap, if any |
|
|
McCloskey |
|
|
NIRCam TBD/TBR Progress & Plan

|
|
|
|