| Number |
Title |
Assigned To |
Due Date |
Status |
| NIRCAM Instrument Level CDR 5/23/2006 |
|
|
|
| JWST-NIRCam-CDR-001 |
Combined KM/NIRCam Systems Test |
A. Nordt |
2/1/2007 |
|
| JWST-NIRCam-CDR-002 |
NIRCam Mechanical Disturbance Analysis & Verification |
A. Nordt |
2/1/2007 |
|
| JWST-NIRCam-CDR-003 |
CPT 1 Test at 39K |
M. Pryor |
2/1/2007 |
|
| JWST-NIRCam-CDR-004 |
Optics Mounts |
T. Kvamme |
2/1/2007 |
|
| JWST-NIRCam-CDR-005 |
Systems I&T |
M .Pryor |
2/1/2207 |
|
| JWST-NIRCam-CDR-006 |
Drawing status |
B. Steakley |
7/15/2006 |
Late |
| JWST-NIRCam-CDR-007 |
Stray Light Baffle Coating |
B. Biggs |
7/15/2006 |
Late |
| JWST-NIRCam-CDR-008 |
Focal plane assy cable soldering |
T. Magoncelli |
7/15/2006 |
Late |
| JWST-NIRCam-CDR-009 |
Filter wheel housing test temperatures |
S. McCully |
9/15/2006 |
|
| JWST-NIRCam-CDR-010 |
EEE Parts |
T. King |
9/15/2006 |
Response submitted |
| JWST-NIRCam-CDR-011 |
Optical Chain Workmanship Testing |
T. Kvamme |
9/15/2006 |
|
| JWST-NIRCam-CDR-012 |
ASIC Heatloads and Off-Baseline Case |
L. Osborne |
9/15/2006 |
Response submitted |
| JWST-NIRCam-CDR-013 |
TV Test Cycles - Instrument Level |
M. Pryor |
9/15/2006 |
|
| JWST-NIRCam-CDR-014 |
TV Chamber Readiness |
M. Pryor |
7/15/2006 |
Late |
| JWST-NIRCam-CDR-015 |
Optics Readiness Plan |
T. Kvamme |
7/15/2006 |
Late |
| JWST-NIRCam-CDR-016 |
Beryllium Machining Plan |
A. Nordt |
7/15/2006 |
Late |
| JWST-NIRCam-CDR-017 |
ICE Harness Testing |
J. Thatcher |
9/15/2006 |
Response rejected |
| JWST-NIRCam-CDR-018 |
ICE Power Card - decoupling capacitors |
J. Thatcher |
9/15/2006 |
Response submitted |
| JWST-NIRCam-CDR-019 |
ICE CCA Design |
J. Thatcher |
9/15/2006 |
Response submitted |
| JWST-NIRCam-CDR-020 |
PDPR/PR Plan Change |
M. Pryor |
9/15/2006 |
|
| JWST-NIRCam-CDR-021 |
PIL Straylight |
L. Huff |
9/15/2006 |
|
| JWST-NIRCam-CDR-022 |
Check etalon effects on optics |
L. Huff |
9/15/2006 |
|
| JWST-NIRCam-CDR-023 |
Perform reliability analysis |
B. Bonner |
9/15/2006 |
|
| NIRCam Subsystem CDRs |
|
|
|
| Filter-1 |
Filter fishbone |
S. Horner |
|
|
| Filter-3 |
Ghosting at Edges analysis |
Y. Mao |
|
|
| Filter-9 |
Angle of incidence vs. OOB |
Y. Mao |
|
|
| FPA-3 |
Shielding of temp sensor/heater cable |
T. Magoncelli |
|
|
| FPA-4 |
Document shielding analysis |
B. Biggs |
|
|
| FPA-5 |
Verify CMLBs not radioactive |
E. Young |
|
|
| FPE-8 |
Reliability analysis of FPE/cable/ICP/ASIC/FPA |
T. Magoncelli |
|
|
| FPE-9 |
Delivery schedule for cables |
T. Magoncelli |
|
|
| FPE-10 |
FPE cable length change impact |
T. Magoncelli |
|
|
| FSW-1 |
Release FSW requirements document |
C. Cheng |
|
|
| FSW-7 |
Resolve ASIC load format function (FPE vs. Ground); requirements for API call |
C. Cheng |
|
|
| I&T-2 |
Risk of ETU non-verifications |
|
|
|
| I&T-3 |
Volume measurement on ASMIF |
M. Pryor |
|
|
| I&T-4 |
Correlate warm-to-cold models |
|
|
|
| I&T-5 |
Add test with SMART after FPA installed at Module |
M. Pryor |
|
|
| I&T-6 |
Misalignments in forward and reverse directions |
|
|
|
| I&T-7 |
Provide alignment details |
M. Pryor |
|
|
| I&T-8 |
Cold window transmission at 300K |
|
|
|
| I&T-9 |
Vibrate OA with KMs |
M. Pryor |
|
same as JWST-NIRCam-CDR-001 |
| I&T-10 |
WFE of ambient optics, null lenses |
|
|
|
I&T-11
|
Define alignment budget items |
|
|
|
| I&T-12 |
Align GSE to optical references |
|
|
|
| I&T-13 |
V1 up/down tests |
|
|
|
| I&T-14 |
Include figure uncertainty in alignment |
|
|
|
| I&T-15 |
VIRATAC on each optical element |
|
|
|
| I&T-16 |
Structural test of NIRCam bench |
M. Pryor |
|
|
| ICE-5 |
Position sensor operation and cable length |
J. Thatcher |
|
|
| ICE-7 |
Reliability of stack design and cables |
J. Thatcher |
|
|
| ICE-9 |
Finalize connector design |
J. Thatcher |
|
|
| ICE-10 |
Review position sensor cable spec. |
J. Thatcher |
|
|
| ICE-11 |
Verify sensor wire resistance meets requirement |
J. Thatcher |
|
|
| ICE-12 |
Focus ICE description on ICE capability vs. flight software |
J. Thatcher |
|
|
| ICE-17 |
Check command media vs. NASA parts stress |
J. Thatcher |
|
|
| OBA-3 |
Peel test, shear test, stress analysis of bonded joints |
A. Nordt |
|
|
| OBA-4 |
Assess MS with FS=1.5 |
A. Nordt |
|
|
| OBA-8 |
SE to do independent tolerance analysis |
S. Horner |
|
|
| Optic_mounts-29 |
Flat field source use. |
|
|
|
| Baffles-3 |
Worst case clearance analysis |
B. Biggs |
|
|
| Baffles-5 |
STOP analysis results, clearances |
B. Biggs |
|
|
| Baffles-14 |
ASAP model to assess particles on POM |
|
|
|