NIRCam Calendar
Date Event Details
8/16-18/06 ISIM PDR Dry Run #1 GSFC
8/22/06 NIRCam IBR Palo Alto, CA
8/24-25/06 NIRCam Science Team Tucson, AZ
8/31/06 NIRCam Monthly Palo Alto, CA
9/6-8/06 ISIM PDR Dry Run #2 GSFC
9/12-14/06 Eclipse SRR Redondo Bch, CA
9/21/06 NIRCam Monthly Palo Alto, CA
10/2-4/06 ISIM PDR Final Dry Run GSFC
10/23-24/06 JWST SWG GSFC
10/23/06 IRSU PDR GSFC
10/24-26/06 ISIM PDR GSFC Area
10/27/06 NIRCam Monthly GSFC
11/21/06 NIRCam Monthly Camarillo, CA
11/28-30/06 JWST Quarterly Redondo Bch, CA
12/19/06 NIRCam Monthly Palo Alto, CA

Last Week's Accomplishments

NIRCam Activities for Week Ending 08/02/06

1) Lifted the stop work order at AXSYS as they have complied
with all the Category A requirements. A Lockheed person will
be resident most of the time at AXSYS to provide oversight.
2) Prepared written responses for the NRC NAPA Committee.
3) I&T Team is working on long-lead items including the chamber
He shroud and lifting and rotation fixtures.
4) Arizona is iterating with Rockwell on a shipping container/handling
fixture design.
5) Held a successful strut TIM with Goddard ISIM team members.


Announcements

Rockwell Scientific has been acquired by Teledyne. See announcement here.

NIRCam Top 5
  Item Status Action Next Report
1 Detector Schedule Weekly telecons resumed    
2 Optical Bench Work restarted at Axsys    
3 Lens Triplet Cryo Test      
4 Filter Wheel Life Test with PFD    

 

5

Electronics drawing release

     
Document Status
DRD Title Status Due Comments
IT-03 Instrument and GSE Ground Transportation Plan Returned for minor corrections    
PM-01 Project Management Plan Approved    
SA-02 Contamination Control Plan Returned for changes    
SA-06 Materials Usage List Returned - incomplete    
SA-07 As Designed Parts List Approved    
SA-08 Parts Database Approved    
SA-09 Parts Stress Analysis Approved    
SA-14 Hazard Analysis Returned - Minor Comments    
SE-04 Verification Plan returned    
SE-08 Inputs to IOS ICD Approved    
SE-09 Fault Protection Description Returned with comments    
SE-10 Math Models Returned with comments   thermal & optical ok, mechanical rejected
Pending Changes
Mod Mod Descr CCR # RTC# Description Cost/No Status Due Comments ECD
tbd       Wave 6 Cost Changes yes        
    476   IRD Rev E yes complete      
        NIRCam ETU Spec no        
        NIRCam SOW Rev F yes ready for CCB   NOTES testing, Grism  
tbd       Wave 7 Changes          
        IRD Rev F no        
      34 Outgassing Rate          
      54 Stray Light #2          
      56 IRSU          
      65 FOV Changes          
      68 ICE Sync Changes          
      70 ICP A          
      71 K-mount Allocations          
      72 Alignment TBRs          
      73 Telemetry Rate TBRs          
      74 MIPS          
      75 Survival Loads          
      76 FSW Data Rate          
NIRCam Needs
Need Status ECD Assigned