NIRCam News
August 7, 2006
Previous editions are available in the archive.
|
Tuesday Telecon
Tuesday, August 8, 1600 EDT
Goddard Location: 22/C399A
Dial-in: 877-951-3250, Passcode 108321
Agenda: ICE Simulator
|
NIRCam Calendar
| Date |
Event |
Details |
| 8/16-18/06 |
ISIM PDR Dry Run #1 |
GSFC |
| 8/22/06 |
NIRCam IBR |
Palo Alto, CA |
| 8/24-25/06 |
NIRCam Science Team |
Tucson, AZ |
| 8/31/06 |
NIRCam Monthly |
Palo Alto, CA |
| 9/6-8/06 |
ISIM PDR Dry Run #2 |
GSFC |
| 9/12-14/06 |
Eclipse SRR |
Redondo Bch, CA |
| 9/21/06 |
NIRCam Monthly |
Palo Alto, CA |
| 10/2-4/06 |
ISIM PDR Final Dry Run |
GSFC |
| 10/23-24/06 |
JWST SWG |
GSFC |
| 10/23/06 |
IRSU PDR |
GSFC |
| 10/24-26/06 |
ISIM PDR |
GSFC Area |
| 10/27/06 |
NIRCam Monthly |
GSFC |
| 11/21/06 |
NIRCam Monthly |
Camarillo, CA |
| 11/28-30/06 |
JWST Quarterly |
Redondo Bch, CA |
| 12/19/06 |
NIRCam Monthly |
Palo Alto, CA |
|
Last Week's Accomplishments
NIRCam Activities for Week Ending 08/02/06
1) Lifted the stop work order at AXSYS as they have complied
with all the Category A requirements. A Lockheed person will
be resident most of the time at AXSYS to provide oversight.
2) Prepared written responses for the NRC NAPA Committee.
3) I&T Team is working on long-lead items including the chamber
He shroud and lifting and rotation fixtures.
4) Arizona is iterating with Rockwell on a shipping container/handling
fixture design.
5) Held a successful strut TIM with Goddard ISIM team members.
|
Announcements
Rockwell Scientific has been acquired by Teledyne. See announcement here.
|
NIRCam Top 5
| |
Item |
Status |
Action |
Next Report |
| 1 |
Detector Schedule |
Weekly telecons resumed |
|
|
| 2 |
Optical Bench |
Work restarted at Axsys |
|
|
| 3 |
Lens Triplet Cryo Test |
|
|
|
| 4 |
Filter Wheel Life Test with PFD |
|
|
|
| 5 |
Electronics drawing release
|
|
|
|
|
Document Status
| DRD |
Title |
Status |
Due |
Comments |
| IT-03 |
Instrument and GSE Ground Transportation Plan |
Returned for minor corrections |
|
|
| PM-01 |
Project Management Plan |
Approved |
|
|
| SA-02 |
Contamination Control Plan |
Returned for changes |
|
|
| SA-06 |
Materials Usage List |
Returned - incomplete |
|
|
| SA-07 |
As Designed Parts List |
Approved |
|
|
| SA-08 |
Parts Database |
Approved |
|
|
| SA-09 |
Parts Stress Analysis |
Approved |
|
|
| SA-14 |
Hazard Analysis |
Returned - Minor Comments |
|
|
| SE-04 |
Verification Plan |
returned |
|
|
| SE-08 |
Inputs to IOS ICD |
Approved |
|
|
| SE-09 |
Fault Protection Description |
Returned with comments |
|
|
| SE-10 |
Math Models |
Returned with comments |
|
thermal & optical ok, mechanical rejected |
|
Pending Changes
| Mod |
Mod Descr |
CCR # |
RTC# |
Description |
Cost/No |
Status |
Due |
Comments |
ECD |
| tbd |
|
|
|
Wave 6 Cost Changes |
yes |
|
|
|
|
| |
|
476 |
|
IRD Rev E |
yes |
complete |
|
|
|
| |
|
|
|
NIRCam ETU Spec |
no |
|
|
|
|
| |
|
|
|
NIRCam SOW Rev F |
yes |
ready for CCB |
|
NOTES testing, Grism |
|
| tbd |
|
|
|
Wave 7 Changes |
|
|
|
|
|
| |
|
|
|
IRD Rev F |
no |
|
|
|
|
| |
|
|
34 |
Outgassing Rate |
|
|
|
|
|
| |
|
|
54 |
Stray Light #2 |
|
|
|
|
|
| |
|
|
56 |
IRSU |
|
|
|
|
|
| |
|
|
65 |
FOV Changes |
|
|
|
|
|
| |
|
|
68 |
ICE Sync Changes |
|
|
|
|
|
| |
|
|
70 |
ICP A |
|
|
|
|
|
| |
|
|
71 |
K-mount Allocations |
|
|
|
|
|
| |
|
|
72 |
Alignment TBRs |
|
|
|
|
|
| |
|
|
73 |
Telemetry Rate TBRs |
|
|
|
|
|
| |
|
|
74 |
MIPS |
|
|
|
|
|
| |
|
|
75 |
Survival Loads |
|
|
|
|
|
| |
|
|
76 |
FSW Data Rate |
|
|
|
|
|
|
NIRCam Needs
|
| |
|
|
|