|
NIRCam News
July 19, 2005
Previous editions are available in the archive.
|
Tuesday Telecon
Tuesday, July 19
No telecon this week due to the JWST Quarterly in Victoria, BC.
|
NIRCam Calendar
| Date |
Event |
Details |
| 7/19-21/05 |
JWST Quarterly |
Victoria, BC, Canada |
| 7/19-21/05 |
SIDU Upgrade |
Palo Alto, CA |
| 7/25-26/05 |
WFSC Mini-PIT |
Boulder, CO |
| 7/26-27/05 |
ICDH PDR |
GSFC |
| 7/26/05 |
FIlter Wheel CDR |
Palo Alto, CA |
| 7/27/05 |
PIL CDR |
Palo Alto, CA |
| 7/28/05 |
3-DOF FAM CDR |
Palo Alto, CA |
| 8/4/05 |
Thermal CDR |
Palo Alto, CA |
| 8/8-9/05 |
NIRCam Science Team Mtg |
Palo Alto, CA |
| 8/25/05 |
NIRCam Monthly |
Palo Alto, CA |
| 8/31/05 |
FPA Housing CDR |
Palo Alto, CA |
| 9/20/05 |
NIRCam Monthly |
GSFC |
| 9/21-22/05 |
JWST SWG |
STScI |
| 9/27/05 |
ICE CDR |
Palo Alto, CA |
| 9/28/05 |
FPE CDR |
Palo Alto, CA |
| 9/29/05 |
FSW CDR |
Palo Alto, CA |
|
Last Week's Accomplishments
NIRCam Activities for Week Ending 7/12/05
1) Held a successful Optical Bench CDR.
2) Bonding procedures to be used on the
NIRCam Be bench were tested on a plexiglass
bench replica. Results were excellent.
3) Continued responding to queries from the
teams reviewing the Project.
4) Prepared the first draft of a Configuration
Management Plan for Arizona FPA drawings.
5) Received test data from Rockwell on SCAs
that will be used in the Development Unit FPA.
|
|
NIRCam Top 5
| |
Item |
Status |
Action |
Next Report |
| 1 |
FY06 Funding |
NIRCam team determing schedule impact |
|
|
| 2 |
Requirements |
See below - stray light is particular emphasis |
|
|
| 3 |
Detector Packaging |
|
|
|
| 4 |
Detector BCS Failure |
|
|
7/13/05
|
| 5 |
Filter Wheel Accuracy |
|
Expect resolution @ FWA CDR |
7/26/05 |
|
Document Status
| DRD |
Title |
Status |
Due |
Comments |
| SE-04 |
Verification Plan |
Rejected |
7/27/05 |
|
| IT-01 |
I&T Plan |
Rejected |
tbd |
On hold for resolution of NOTES testing plan. |
| SA-14 |
Safety Plan |
Rejected |
6/23/2005 |
Need to work with J. Rauscher to resolve. |
|
Pending Changes
| Mod |
Mod Descr |
CCR # |
RTC# |
Description |
Cost/No |
Status |
Due |
Comments |
ECD |
| 23 |
PAR2MAR |
|
|
Replace PAR with MAR Rev A. |
Yes |
Complete |
|
|
|
| tbd |
3-mo schedule slip |
|
|
3-Month Schedule Slip |
Yes |
Tech Eval |
7/8/05 |
|
|
| tbd |
Wave 4 |
|
|
Wave 4 Changes |
yes |
RFP |
tbd |
|
|
| |
|
207 |
|
NIRCam Spec Rev B (PDR) |
yes |
Complete |
|
|
|
| |
|
231 |
|
IRD Rev A. |
yes |
Complete |
|
|
|
| |
|
235 |
|
DMGSER Rev A |
yes
|
Complete |
|
|
|
| |
|
236 |
|
GFP List Rev. A |
yes |
Complete |
|
|
|
| |
|
259 |
|
Mech GSE in Contract B.1 |
yes |
Complete |
|
|
|
| |
|
268 |
|
Contract Attachment N |
no |
Complete |
|
|
|
| tbd |
Wave 5 |
|
|
Wave 5 Changes |
yes |
|
|
|
|
| |
|
tbd |
|
X month Schedule Slip |
yes |
draft |
|
|
|
| |
|
313 |
|
SOW Rev E (Test Changes) |
Yes |
CCB |
|
|
|
| |
|
tbd |
|
DRD Rev G |
no |
Draft |
|
Add EEE Parts |
|
| |
|
tbd |
|
MAR Rev B |
Yes |
Draft |
|
|
|
| |
|
320 |
|
IRD Rev C |
Yes |
Comment |
7/8/05 |
|
|
| |
|
|
019D |
NIRCam Discretes |
no |
Complete |
|
|
|
| |
|
|
020A |
Focus |
no |
Complete |
|
|
|
| |
|
|
021A |
Pupil Shear |
no |
Complete |
|
|
|
| |
|
|
022A |
Code Format |
no |
Complete |
|
|
|
| |
|
|
023C |
Launch Pressure Profile |
no |
Complete |
|
|
|
| |
|
|
024B |
V1 Down Testing |
no |
Complete |
|
|
|
| |
|
|
027B |
NIRCam Fault Protection |
no |
Complete |
|
|
|
| |
|
312 |
|
ISIM Requirements Doc Rev A |
|
CCB |
7/5/05 |
|
|
| |
|
tbd |
|
NIRCam Spec Rev C |
|
|
|
|
|
| tbd |
Wave 6 |
|
|
Wave 6 Changes |
|
|
|
|
|
| |
|
tbd |
|
IRD Rev D |
|
Draft |
|
|
|
| |
|
|
008C |
Thermal |
|
Loop 3 |
|
|
|
| |
|
|
015B |
I&T Test Aids |
|
Loop 3 |
|
|
|
| |
|
|
017A |
On Orbit Sine |
|
Loop 3 |
|
|
|
| |
|
|
018A |
Radiative Heat Transfer |
|
Loop 3 |
|
|
|
| |
|
|
025B |
PIL Distortion |
|
Loop 3 |
|
|
|
| |
|
|
026C |
Mechanisms |
|
Loop 3 |
|
|
|
| |
|
|
028A |
ASIC |
|
Loop 3 |
|
|
|
| |
|
|
030A |
FSW Telemetry Rate |
|
Loop 3 |
|
|
|
| |
|
|
031A |
PIL Image & WFE |
|
Loop 3 |
|
|
|
| |
|
|
032B |
WFS&C |
|
Loop 3 |
|
|
|
| |
|
|
tbd |
TBD/TBR reduction |
|
draft |
|
|
|
| tbd |
tbd |
tbd |
|
IRD Rev E |
|
|
|
|
|
| |
|
|
029A |
I&T Aids |
|
Loop 1 |
|
|
|
| |
|
|
033A |
Electrical TBRS |
|
Loop 1 |
|
|
|
| |
|
|
034A |
Outgassing Rate |
|
Loop 1 |
|
|
|
| |
|
|
035A |
PIL WFE |
|
Loop 1 |
|
|
|
| |
|
|
036A |
Structural Interface Load |
|
Loop 1 |
|
|
|
| |
|
|
041A |
Radiation |
|
Loop 1 |
|
|
|
|
NIRCam Needs
| Need |
Status |
ECD |
Assigned |
|
| Requirements Baseline by July 31 |
See "Pending Changes" above. |
7/31/05 TBR |
Lundquist |
|
| Index measurements of fused silica |
ZnSe & LiF complete. BaF2 due 7/11/05 |
7/11/05 |
Leviton |
|
| Mechanical ICD EO2 release |
EO1 & EO2 expected final by Bench CDR |
7/26/05 |
Crow |
|
| ASIC Ops Concept & interface documents |
ops concept out for review |
|
Dutta |
|
| Additional SWTS for SIDU+ #2 |
not going to happen due to $$ |
|
Campbell |
|
| Guidance on financial planning for FY06 |
Final budget/schedule agreement expected at Qtrly |
|
Sullivan |
|
|
NIRCam TBD/TBR Progress & Plan

|
|
|
|