NIRCam News
July 17, 2006
Previous editions are available in the archive.
|
Tuesday Telecon
Tuesday, July 18, 1330 EDT (Note earlier start time!)
Goddard Location: 22/C399A
Dial-in: 877-951-3250, Passcode 108321
Agenda: Discuss comments to Verification Plan
|
NIRCam Calendar
| Date |
Event |
Details |
| 7/20/06 |
NIRCam Monthly |
Camarillo, CA |
| 7/25-26/06 |
ISIM Verification and I&T Summit |
GSFC Area |
| 7/27/06 |
K-Mount TIM |
GSFC |
| 8/16-18/06 |
ISIM PDR Dry Run #1 |
GSFC |
| 8/24-25/06 |
NIRCam Sciecne Team Mtg |
Tucson, AZ |
| 8/31/06 |
NIRCam Monthly |
Palo Alto, CA |
| 9/6-8/06 |
ISIM PDR Dry Run #2 |
GSFC |
| 9/12-14/06 |
Eclipse SRR |
Redondo Bch, CA |
| 9/21/06 |
NIRCam Monthly |
Palo Alto, CA |
| 10/2-4/06 |
ISIM PDR Final Dry Run |
GSFC |
| 10/23-24/06 |
JWST SWG |
GSFC |
| 10/23/06 |
IRSU PDR |
GSFC |
| 10/24-26/06 |
ISIM PDR |
GSFC Area |
| 10/27/06 |
NIRCam Monthly |
GSFC |
| 11/21/06 |
NIRCam Monthly |
Camarillo, CA |
| 11/28-30/06 |
JWST Quarterly |
Redondo Bch, CA |
| 12/19/06 |
NIRCam Monthly |
Palo Alto, CA |
|
Last Week's Accomplishments
NIRCam Activities for Week Ending July 11, 2006
1) NIRCam Internal Be Fracture Investigation Team started
work, and began filling in a fishbone analysis.
2) Arizona FPA Team held a document and procedure review
with Rockwell for cable assemblies.
3) Received word from Goddard that the Hytek boards used
in the cable assembly passed DPA and amy be used for flight
cabels assemblies.
4) All parts have been received and are in cleaning for
the Filter Wheel Assembly prototype re-build including a
passive friction device.
5) MOOG has shown the damaged harmonic drive from the FAM
linear actuator test to the manufactor who stated that the dmage
was mostly likely from inadequate lubricant as had been thought
by the NIRCam Team.
6) The first cold test of the beamsplitter has been run and the
part meets specs. This test was run without a mount to isolate
effects due to the coatings, and just tested the front side. The
back side will be tested shortly and a full up mounted test will
occur later.
|
|
NIRCam Top 5
| |
Item |
Status |
Action |
Next Report |
| 1 |
Optical Bench Damage |
Mtg at Axsys 7/12-13 |
|
|
| 2 |
Detector Packaging & Test |
|
|
at Monthly 7/20 |
| 3 |
Lens Triplet Cryo Test |
|
|
|
| 4 |
Filter Wheel Life Test with PFD |
|
|
|
| 5 |
Electronics drawing release
|
|
|
|
|
Document Status
| DRD |
Title |
Status |
Due |
Comments |
| IT-03 |
Instrument and GSE Ground Transportation Plan |
Returned for minor corrections |
6/5/2006 |
|
| PM-01 |
Project Management Plan |
Approved |
|
|
| SA-02 |
Contamination Control Plan |
Returned for changes |
6/5/2006 |
|
| SA-06 |
Materials Usage List |
Returned - incomplete |
6/9/2006 |
|
| SA-07 |
As Designed Parts List |
Approved |
|
|
| SA-08 |
Parts Database |
Approved |
|
|
| SA-09 |
Parts Stress Analysis |
Approved |
|
|
| SA-14 |
Hazard Analysis |
Returned - Minor Comments |
6/5/2006 |
|
| SE-04 |
Verification Plan |
Distr for Review |
6/9/2006 |
Need mtg or telecon to work issues - 7/18/06 |
| SE-08 |
Inputs to IOS ICD |
Approved |
|
|
| SE-09 |
Fault Protection Description |
Returned with comments |
|
|
| SE-10 |
Math Models |
Returned with comments |
|
|
|
Pending Changes
| Mod |
Mod Descr |
CCR # |
RTC# |
Description |
Cost/No |
Status |
Due |
Comments |
ECD |
| tbd |
|
|
|
Wave 6 Cost Changes |
yes |
|
|
|
|
| |
|
476 |
|
IRD Rev E |
yes |
complete |
|
|
|
| |
|
|
|
NIRCam ETU Spec |
no |
|
|
|
|
| |
|
|
|
NIRCam SOW Rev F |
yes |
out for comment |
|
NOTES testing, Grism |
|
| tbd |
|
|
|
Wave 7 Changes |
|
|
|
|
|
| |
|
|
|
IRD Rev F |
no |
|
|
|
|
| |
|
|
34 |
Outgassing Rate |
|
|
|
|
|
| |
|
|
54 |
Stray Light #2 |
|
|
|
|
|
| |
|
|
56 |
IRSU |
|
|
|
|
|
| |
|
|
65 |
FOV Changes |
|
|
|
|
|
| |
|
|
68 |
ICE Sync Changes |
|
|
|
|
|
| |
|
|
70 |
ICP A |
|
|
|
|
|
| |
|
|
71 |
K-mount Allocations |
|
|
|
|
|
| |
|
|
72 |
Alignment TBRs |
|
|
|
|
|
| |
|
|
73 |
Telemetry Rate TBRs |
|
|
|
|
|
| |
|
|
74 |
MIPS |
|
|
|
|
|
| |
|
|
75 |
Survival Loads |
|
|
|
|
|
| |
|
|
76 |
FSW Data Rate |
|
|
|
|
|
|
NIRCam Needs
|
| |
|
|
|