NIRCam Calendar
Date Event Details
7/12-13/06 Axsys Incident Investigation Cullman, AL
7/20/06 NIRCam Monthly Camarillo, CA
7/25-26/06 ISIM Verification and I&T Summit GSFC Area
7/27/06 K-Mount TIM GSFC
8/24-25/06 NIRCam Science Team Tucson
8/31/06 NIRCam Monthly Palo Alto, CA
9/12-14/06 Eclipse SRR Redondo Bch, CA
9/21/06 NIRCam Monthly Palo Alto, CA
10/23-24/06 JWST SWG GSFC Area
10/24-26/06 ISIM PDR GSFC Area
10/27/06 NIRCam Monthly GSFC
11/21/06 NIRCam Monthly Camarillo, CA
11/28-30/06 JWST Quarterly Redondo Bch, CA
12/19/06 NIRCam Monthly Palo Alto, CA

Last Week's Accomplishments




Announcements

 

NIRCam Top 5
  Item Status Action Next Report
1 Optical Bench Damage Mtg at Axsys 7/12-13    
2 Detector Packaging & Test     at Monthly 7/20
3 Lens Triplet Cryo Test      
4 Filter Wheel Life Test with PFD    

 

5

Electronics drawing release

     
Document Status
DRD Title Status Due Comments
IT-03 Instrument and GSE Ground Transportation Plan Returned for minor corrections 6/5/2006  
PM-01 Project Management Plan Approved    
SA-02 Contamination Control Plan Returned for changes 6/5/2006  
SA-06 Materials Usage List Returned - incomplete 6/9/2006  
SA-07 As Designed Parts List Approved    
SA-08 Parts Database Approved    
SA-09 Parts Stress Analysis Approved    
SA-14 Hazard Analysis Returned - Minor Comments 6/5/2006  
SE-04 Verification Plan Distr for Review 6/9/2006 Need mtg or telecon to work issues
SE-08 Inputs to IOS ICD Approved    
SE-09 Fault Protection Description comments pending    
SE-10 Math Models comments pending    
Pending Changes
Mod Mod Descr CCR # RTC# Description Cost/No Status Due Comments ECD
tbd       Wave 6 Cost Changes yes        
    476   IRD Rev E yes complete      
        NIRCam ETU Spec no        
        NIRCam SOW Rev F yes out for comment   NOTES testing, Grism  
        IRD Rev F no        
      34 Outgassing Rate          
      54 Stray Light #2          
      56 IRSU          
      65 FOV Changes          
      68 ICE Sync Changes          
      70 ICP A          
      71 K-mount Allocations          
      72 Alignment TBRs          
      73 Telemetry Rate TBRs          
      74 MIPS          
      75 Survival Loads          
      76 FSW Data Rate          
NIRCam Needs
Need Status ECD Assigned