NIRCam News
June 28, 2005
|
Tuesday Telecon
Tuesday, June 28; 1600 EDT
Goddard Location: 22/399
Dial-in: 877-951-3250, Code 108321
Agenda: Mechanical - OBA testing & K-mount availability
Mechanical - FPE Harness Routing & Connector Panel
RTC & Pending Changes Planning - see below
|
NIRCam Calendar
| Date |
Event |
Details |
| 7/12/05 |
Optical Bench Assy CDR |
Palo Alto, CA |
| 7/13/05 |
Stray Light Baffles CDR |
Palo Alto, CA |
| 7/19-21/05 |
JWST Quarterly |
Victoria, BC, Canada |
| 7/25-26/05 |
WFSC Mini-PIT |
Boulder, CO |
| 7/26-27/05 |
ICDH PDR |
GSFC |
| 7/26/05 |
FIlter Wheel CDR |
Palo Alto, CA |
| 7/27/05 |
PIL CDR |
Palo Alto, CA |
| 7/28/05 |
3-DOF FAM CDR |
Palo Alto, CA |
| 8/4/05 |
Thermal CDR |
Palo Alto, CA |
| 8/8-9/05 |
NIRCam Science Team Mtg |
Palo Alto, CA |
| 8/25/05 |
NIRCam Monthly |
Palo Alto, CA |
| 8/31/05 |
FPA Housing CDR |
Palo Alto, CA |
| 9/27/05 |
ICE CDR |
Palo Alto, CA |
| 9/28/05 |
FPE CDR |
Palo Alto, CA |
| 9/29/05 |
FSW CDR |
Palo Alto, CA |
|
Last Week's Accomplishments
1) Meeting to close Ball packaging contract held at Ball
with inventories, drawings, and cert logs reviewed.
2) Residual parts from Ball packaging contract received at Arizona.
3) Began an exercise to look at consequence to NIRCam
development if FY06 budget were to be cut about in half.
4) Completed a contamination study that has led to a
design for heaters on the NIRCam pick-off mirrors.
5) A revised design for the short wavelength FPA has been
sent from Arizona to Lockheed Martin for thermal and structural
analysis.
|
Announcements
Mitra Dutta is organizing another order of ISIM-logo merchandise from Land's End. Contact Mitra (mdutta@pop200.gsfc.nasa.gov) if you're interested.
|

NIRCam Optical Bench - 1st Beryllium Part being machined at Axsys. (Photo Axsys Corp.) |
NIRCam Top 5
| |
Item |
Status |
Action |
Next Report |
| 1 |
Funding |
|
|
|
| 2 |
Detector Packaging |
|
|
|
| 3 |
Detector BCS |
|
|
|
| 4 |
Filter Wheel Accuracy |
|
|
|
| 5 |
Instrument Throughput |
|
|
|
|
Document Status
| DRD |
Title |
Status |
Due |
Comments |
| SA-01 |
QA Plan |
Approved |
|
|
| SE-04 |
Verification Plan |
Rejected |
7/27/05 |
|
| IT-01 |
I&T Plan |
Rejected |
tbd |
On hold for resolution of NOTES testing plan. |
| SA-14 |
Safety Plan |
Rejected |
6/23/2005 |
Need to work with J. Rauscher to resolve. |
|
Pending Changes
| Mod |
Mod Descr |
CCR # |
RTC# |
Description |
Cost/No |
Status |
Due |
Comments |
ECD |
| tbd |
PAR2MAR |
|
|
Replace PAR with MAR Rev A. |
Yes |
Negotiations |
7/1/05 |
|
|
| tbd |
3-mo schedule slip |
|
|
3-Month Schedule Slip |
Yes |
Proposal |
6/27/05 |
|
|
| tbd |
Wave 4 |
|
|
Wave 4 Changes |
yes |
RFP |
tbd |
|
|
| |
|
207 |
|
NIRCam Spec Rev B (PDR) |
yes |
Complete |
|
|
|
| |
|
231 |
|
IRD Rev A. |
yes |
Complete |
|
|
|
| |
|
235 |
|
DMGSER Rev A |
yes
|
Complete |
|
|
|
| |
|
236 |
|
GFP List Rev. A |
yes |
Complete |
|
|
|
| |
|
259 |
|
Mech GSE in Contract B.1 |
yes |
Complete |
|
|
|
| |
|
268 |
|
Contract Attachment N |
no |
Complete |
|
|
|
| tbd |
Wave 5 |
|
|
Wave 5 Changes |
yes |
|
|
|
|
| |
|
313 |
|
SOW Rev E (Test Changes) |
Yes |
Open |
|
|
|
| |
|
tbd |
|
MAR Rev B |
Yes |
Draft |
|
|
|
| |
|
320 |
|
IRD Rev C |
Yes |
Comment |
7/1/05 |
|
|
| |
|
|
019D |
NIRCam Discretes |
|
Complete |
|
|
|
| |
|
|
020A |
Focus |
|
Complete |
|
|
|
| |
|
|
021A |
Pupil Shear |
|
Complete |
|
|
|
| |
|
|
022A |
Code Format |
|
Complete |
|
|
|
| |
|
|
023C |
Launch Pressure Profile |
|
Complete |
|
|
|
| |
|
|
024B |
V1 Down Testing |
|
Complete |
|
|
|
| |
|
|
027B |
NIRCam Fault Protection |
|
Complete |
|
|
|
| |
|
312 |
|
ISIM Requirements Doc Rev A |
|
CCB |
7/5/05 |
|
|
| |
|
tbd |
|
NIRCam Spec Rev C |
|
|
|
|
|
| tbd |
Wave 6 |
|
|
Wave 6 Changes |
|
|
|
|
|
| |
|
tbd |
|
IRD Rev D |
|
|
|
|
|
| |
|
|
008B |
Thermal |
|
Loop 2 |
7/1/05 |
|
|
| |
|
|
015B |
I&T Test Aids |
|
Loop 3 |
|
|
|
| |
|
|
017A |
On Orbit Sine |
|
Loop 3 |
|
|
|
| |
|
|
018A |
Radiative Heat Transfer |
|
Loop 3 |
|
|
|
| |
|
|
025A |
PIL Distortion |
|
Loop 2 |
7/1/05 |
|
|
| |
|
|
026A |
Mechanisms |
|
Loop 2 |
7/1/05 |
|
|
| |
|
|
028A |
ASIC |
|
Loop 2 |
7/1/05 |
|
|
| |
|
|
030A |
FSW Telemetry Rate |
|
Loop 2 |
7/1/05 |
|
|
| |
|
|
031A |
PIL Image & WFE |
|
Loop 2 |
7/1/05 |
|
|
| |
|
|
032A |
WFS&C |
|
Loop 2 |
7/1/05 |
|
|
| |
|
|
tbd |
TBD/TBR reduction |
|
draft |
|
|
|
| tbd |
tbd |
tbd |
|
IRD Rev E |
|
|
|
|
|
| |
|
|
029A |
I&T Aids |
|
Loop 1 |
|
|
|
| |
|
|
033A |
Electrical TBRS |
|
Loop 1 |
|
|
|
| |
|
|
034A |
Outgassing Rate |
|
Loop 1 |
|
|
|
| |
|
|
035A |
PIL WFE |
|
Loop 1 |
|
|
|
| |
|
|
036A |
Structural Interface Load |
|
Loop 1 |
|
|
|
| |
|
|
041A |
Radiation |
|
Loop 1 |
|
|
|
|
NIRCam Needs
| Need |
Status |
ECD |
Assigned |
|
| Requirements Baseline by July 31 |
See "Pending Changes" above. |
7/31/05 TBR |
Lundquist |
|
| Index measurements of fused silica |
Kepler tests started 6/14 |
6/30/05 |
Leviton |
|
| Mechanical ICD EO2 release |
|
|
Carter |
|
| ASIC Ops Concept & interface documents |
|
|
Dutta |
|
| Additional SWTS for SIDU+ #2 |
|
|
Campbell |
|
| Guidance on financial planning for FY06 |
Telecon with Pam Sullivan on 6/22/05 |
|
Sullivan |
|
|
NIRCam TBD/TBR Progress & Plan

|
|
|
|