NIRCam News
June 26, 2006
Previous editions are available in the archive.
|
Tuesday Telecon
Tuesday, June 27, 1600 EDT
Goddard Location: 22/C399A
Dial-in: 877-951-3250, Passcode 108321
Agenda: NIRCam Kinematic Mounts and Requirements
|
NIRCam Calendar
| Date |
Event |
Details |
| 6/28-29/06 |
JWST SWG |
Montreal |
| 7/20/06 |
NIRCam Monthly |
Camarillo, CA |
| 7/25-26/06 |
ISIM Verification and I&T Summit |
GSFC Area |
| 8/31/06 |
NIRCam Monthly |
Palo Alto, CA |
| 9/21/06 |
NIRCam Monthly |
Palo Alto, CA |
| 10/18-19/06 |
JWST SWG |
Boulder, CO |
| 10/24-26/06 |
ISIM PDR |
GSFC Area |
| 10/27/06 |
NIRCam Monthly |
GSFC |
| 11/21/06 |
NIRCam Monthly |
Camarillo, CA |
| 11/28-30/06 |
JWST Quarterly |
Redondo Bch, CA |
| 12/19/06 |
NIRCam Monthly |
Palo Alto, CA |
|
Last Week's Accomplishments
NIRCam Activities for Week Ending 06/21/06
1) ICE Team performed an end-to-end test of FWA control using
a flight software simulator to control the DIO board which in
turn controlled the mechanism.
2) Completed two more SCA cable assemblies.
3) Working with MOOG to analyze the actuator life test failure that
resulted from inadequate dichronite lubricant thickness.
4) Supported the ISIM Thermal PDR and the IEC SRR.
|
|
NIRCam Top 5
| |
Item |
Status |
Action |
Next Report |
| 1 |
Detector Packaging & Test |
|
|
|
| 2 |
Lens Triplet Cryo Test |
|
|
|
| 3 |
Filter Wheel Life Test with PFD |
|
|
|
| 4 |
Electronics drawing release
|
|
|
|
|
Document Status
| DRD |
Title |
Status |
Due |
Comments |
| IT-03 |
Instrument and GSE Ground Transportation Plan |
Returned for minor corrections |
6/5/2006 |
|
| PM-01 |
Project Management Plan |
Approved |
|
|
| SA-02 |
Contamination Control Plan |
Returned for changes |
6/5/2006 |
|
| SA-06 |
Materials Usage List |
Returned - incomplete |
6/9/2006 |
|
| SA-07 |
As Designed Parts List |
Distr for Review |
6/5/2006 |
|
| SA-08 |
Parts Database |
Distr for Review |
6/5/2006 |
|
| SA-09 |
Parts Stress Analysis |
Approved |
|
|
| SA-14 |
Hazard Analysis |
Distr for Review |
6/5/2006 |
|
| SE-04 |
Verification Plan |
Distr for Review |
6/9/2006 |
Need mtg or telecon to work issues |
| SE-08 |
Inputs to IOS ICD |
Approved |
|
|
| SE-09 |
Fault Protection Description |
Distr for Review |
6/9/2006 |
|
| SE-10 |
Math Models |
Distr for Review |
6/30/2006 |
|
|
Pending Changes
| Mod |
Mod Descr |
CCR # |
RTC# |
Description |
Cost/No |
Status |
Due |
Comments |
ECD |
| tbd |
|
|
|
Wave 6 Cost Changes |
yes |
|
|
|
|
| |
|
476 |
|
IRD Rev E |
yes |
complete |
|
|
|
| |
|
|
|
NIRCam ETU Spec |
no |
|
|
|
|
| |
|
|
|
NIRCam SOW Rev F |
yes |
out for comment |
|
NOTES testing, Grism |
|
| |
|
|
|
IRD Rev F |
no |
|
|
|
|
| |
|
|
34 |
Outgassing Rate |
|
|
|
|
|
| |
|
|
54 |
Stray Light #2 |
|
|
|
|
|
| |
|
|
56 |
IRSU |
|
|
|
|
|
| |
|
|
65 |
FOV Changes |
|
|
|
|
|
| |
|
|
68 |
ICE Sync Changes |
|
|
|
|
|
| |
|
|
70 |
ICP A |
|
|
|
|
|
| |
|
|
71 |
K-mount Allocations |
|
|
|
|
|
| |
|
|
72 |
Alignment TBRs |
|
|
|
|
|
| |
|
|
73 |
Telemetry Rate TBRs |
|
|
|
|
|
| |
|
|
74 |
MIPS |
|
|
|
|
|
| |
|
|
75 |
Survival Loads |
|
|
|
|
|
| |
|
|
76 |
FSW Data Rate |
|
|
|
|
|
|
NIRCam Needs
| Need |
Status |
ECD |
Assigned |
|
| Spacewire ICD & Spec |
|
|
Aguilar |
|
| Loads from harness/thermal straps |
|
|
Crow |
|
| Info on ground strap, if any |
|
|
McCloskey |
|
| SIDU Upgrade for ASIC |
|
|
Guy |
|
|
| |
|
|
|