NIRCam News
April 10, 2006
Previous editions are available in the archive.
|
|
NIRCam Calendar
| Date |
Event |
Details |
| 4/18/06 |
NIRCam I&T CDR |
Palo Alto, CA |
| 4/11/06 |
FWA,PIL CDR Closure |
Palo Alto, CA |
| 4/20/06 |
FSW CDR |
Palo Alto, CA |
| 4/25-27/06 |
JWST Quarterly |
Noordwijk, Netherlands |
| 5/22-23/06 |
NIRCam CDR |
Palo Alto, CA |
| 6/22/06 |
NIRCam Monthly |
Palo Alto, CA |
| 6/28-29/06 |
JWST SWG |
Montreal, Canada |
| 7/20/06 |
NIRCam Monthly |
Palo Alto, CA |
| 8/31/06 |
NIRCam Monthly |
Palo Alto, CA |
| 10/25-26-/06 |
JWST SWG |
Boulder, CO |
| 11/28-30/06 |
JWST Quarterly |
Redondo Beach, CA |
|
Last Week's Accomplishments
NIRCam Activities for Week Ending 3/28/06
1) Received new CMLBs for SCA mounts from HyTek. Samples
will be sent shortly to GSFC for DPA.
2) Held a successful ICE CDR.
3) Held an internal instrument CDR kick-off meeting.
4) Sent first two revised SCA shipping containers to RSC
via NTS which performs a final cleaning step.
5) Developed an acceptable degassing procedure for epoxies
using in SCA cable potting.
|
Announcements
NIRCam FPA CDR charts are available on NGIN as JWST-RVW-006193.
NIRCam Monthly charts are in NGIN shared files in the NIRCam folder.
|
NIRCam Top 5
| |
Item |
Status |
Action |
Next Report |
| 1 |
Requirements |
see below |
|
|
| 2 |
Detector Packaging |
waiting for flex cables |
|
|
| 3 |
Budget |
|
|
|
| 4 |
Optical Alignment Plan |
|
|
|
|
Document Status
| DRD |
Title |
Status |
Due |
Comments |
| SE-04 |
Verification Plan |
Rejected |
7/27/05 |
|
| IT-01 |
I&T Plan |
Rejected |
tbd |
|
|
Pending Changes
| Mod |
Mod Descr |
CCR # |
RTC# |
Description |
Cost/No |
Status |
Due |
Comments |
ECD |
| tbd |
Wave 5 |
|
|
Wave 5 Changes |
yes |
RFP |
|
|
|
| |
|
312 |
|
ISIM Reqts Doc Rev A |
yes |
Complete |
|
Adds reliability calcs |
|
| |
|
382 |
|
ISIM Reqts Doc Rev B |
|
Complete |
|
|
|
| |
|
TBD |
|
NIRCam Spec Rev D |
yes |
CM |
|
ISIM RD Rev B, IRD Rev D |
|
| |
|
313 |
|
SOW Rev E (Test Changes) |
Yes |
Complete |
|
|
|
| |
|
339 |
|
MAR Rev B |
Yes |
Complete |
|
Adds S/W QA |
|
| |
|
364 |
|
MICD EO# 1, 2, 3,4 |
Yes |
Complete |
|
|
|
| |
|
385 |
|
IRD Rev D |
Yes |
Complete |
|
|
|
| |
|
tbd |
|
NIRCam ETU Specification |
|
Loop 1 |
|
|
|
| tbd |
|
|
|
Wave 6 Changes |
|
|
|
|
|
| |
|
tbd |
|
IRD Rev E |
|
|
11/30/05 |
|
|
| |
|
|
030A |
FSW Telemetry Rate |
|
Loop 2 |
|
|
|
| |
|
|
034A |
Outgassing Rate |
|
Loop 2 |
|
|
|
| |
|
|
039 |
FAM Cover |
|
Loop 1 |
|
|
|
| |
|
|
036A |
Structural Interface Load |
|
Loop 1 |
|
|
|
| |
|
|
040 |
FWA Power-On Hold |
|
Draft |
|
|
|
| |
|
|
041A |
Radiation |
|
Loop 2 |
|
|
|
| |
|
|
049A |
Handling Procedures |
|
Loop 3 |
|
|
|
| |
|
|
050A |
WFS&C #4 |
|
Loop 1 |
|
|
|
| |
|
|
052A |
Moving Target |
|
Loop 2 |
|
|
|
| |
|
|
054A |
Stray Light #2 |
|
Loop 1 |
|
|
|
| |
|
|
056 |
IRSU |
|
Draft |
|
|
|
| |
|
|
057 |
Optical Alignment #2 |
|
Draft |
|
|
|
| |
|
|
059 |
Launch Loads |
|
Loop 2 |
|
|
|
| |
|
|
062 |
OTE Rev B Prescription |
|
Loop 1 |
|
|
|
| |
|
|
065 |
FOV Changes |
|
Loop 1 |
|
|
|
| |
|
|
067 |
Alignment Accomodation |
|
Loop 1 |
|
|
|
| |
|
|
ISIM-12 |
Image Motion |
|
|
|
|
|
| |
|
|
ISIM-15 |
Static WFE |
|
Loop 3 |
|
|
|
| |
|
|
ISIM-16 |
Reliability |
|
|
|
|
|
|
NIRCam Needs
| Need |
Status |
ECD |
Assigned |
|
| Resolve TBXs in NIRCam Reqts Documents |
See "Pending Changes" above. |
7/31/05 TBR |
Lundquist |
|
| NIRCam Drill template to Axsys |
delayed by funding runout at GSFC |
3/15/06 |
Crow |
|
| ASIC Ops Concept & interface documents |
TIM 12/2/2005 |
|
Dutta |
|
| Spacewire ICD & Spec |
|
|
Aguilar |
|
| Loads from harness/thermal straps |
|
|
Crow |
|
| Info on ground strap, if any |
|
|
McCloskey |
|
| SIDU Upgrade for ASIC |
|
|
Guy |
|
|
NIRCam TBD/TBR Progress & Plan

|
|
|
|