March 7 , 2006
Previous editions are available in the archive.

Tuesday Telecon

Tuesday, March 7, 1600 EST

Goddard Location: 22/C399

Dial-in information: 877-951-3250 passcode: 108321

Agenda: ICD Status, FPE & ICE input review, Outgassing Rate RTC.

NIRCam Calendar
Date Event Details
3/22/06 ICE CDR Palo Alto, CA
3/23/06 NIRCam Monthly Tucson, Az
3/28/06 NIRCam I&T CDR Palo Alto, CA
3/29-30/06 I&T and Verif Mtg GSFC
4/4/06 FPE CDR Palo Alto, CA
4/11/06 FWA,PIL CDR Closure Palo Alto, CA
4/20/06 FSW CDR Palo Alto, CA
4/25-27/06 JWST Quarterly Noordwijk, Netherlands
5/24-25/06 NIRCam CDR Palo Alto, CA
5/25/06 (TBR) NIRCam Monthly GSFC
6/22/06 NIRCam Monthly Palo Alto, CA
6/28-29/06 JWST SWG Montreal, Canada
7/20/06 NIRCam Monthly Palo Alto, CA
8/31/06 NIRCam Monthly Palo Alto, CA
10/25-26-/06 JWST SWG Boulder, CO
11/28-30/06 JWST Quarterly Redondo Beach, CA

Last Week's Accomplishments

NIRCam Activities for Week Ending 2/28/06

1) Substantial progress has been made on the ICE and FPE portions of the NIRCam ICD with draft release expected next week.

2) ETU lenses are now in polishing with delivery anticipated on schedule at the end of March.

3) Internal I&T review held in preparation for CDR next month -some work still to be done!

4) Discovered a small discrepancy in the refractive index for the PIL lenses before fab had started. A revised PIL prescirption will be issued next week (less than 0.5% change in one radius of curvature).

5) NIRCam supported the rogue path meeting, FSW Review, and IRSU reviews.

Announcements

NIRCam FPA CDR charts are available on NGIN as JWST-RVW-006193.

NIRCam Monthly charts are in NGIN shared files in the NIRCam folder.

 

NIRCam Top 5
  Item Status Action Next Report
1 Requirements see below    
2 Detector Packaging waiting for flex cables    
3 Budget    

 

4 Optical Alignment Plan      
Document Status
DRD Title Status Due Comments
SE-04 Verification Plan Rejected 7/27/05  
IT-01 I&T Plan Rejected tbd  
Pending Changes
Mod Mod Descr CCR # RTC# Description Cost/No Status Due Comments ECD
tbd Wave 5     Wave 5 Changes yes RFP  

 

 
    312   ISIM Reqts Doc Rev A yes Complete   Adds reliability calcs  
    382   ISIM Reqts Doc Rev B   Complete      
    TBD   NIRCam Spec Rev D yes CM   ISIM RD Rev B, IRD Rev D  
    313   SOW Rev E (Test Changes) Yes Complete      
    339   MAR Rev B Yes Complete   Adds S/W QA  
    364   MICD EO# 1, 2, 3,4 Yes Complete      
    385   IRD Rev D Yes Complete      
    tbd   NIRCam ETU Specification   Loop 1      
tbd       Wave 6 Changes          
    tbd   IRD Rev E     11/30/05    
      030A FSW Telemetry Rate   Loop 2      
      034A Outgassing Rate   Loop 2      
      039 FAM Cover   Loop 1      
      036A Structural Interface Load   Loop 1      
      040 FWA Power-On Hold   Draft      
      041A Radiation   Loop 2      
      049A Handling Procedures   Loop 3      
      050A WFS&C #4   Loop 1      
      052A Moving Target   Loop 2      
      054A Stray Light #2   Loop 1      
      056 IRSU   Draft      
      057 Optical Alignment #2   Draft      
      059 Launch Loads   Loop 2      
      062 OTE Rev B Prescription   Loop 1      
      065 FOV Changes   Loop 1      
      067 Alignment Accomodation   Loop 1      
      ISIM-12 Image Motion          
      ISIM-15 Static WFE   Loop 3      
      ISIM-16 Reliability          
NIRCam Needs
Need Status ECD Assigned  
Resolve TBXs in NIRCam Reqts Documents See "Pending Changes" above. 7/31/05 TBR Lundquist  
NIRCam Drill template to Axsys delayed by funding runout at GSFC 3/15/06 Crow  
ASIC Ops Concept & interface documents TIM 12/2/2005   Dutta  
Spacewire ICD & Spec     Aguilar  
Loads from harness/thermal straps     Crow  
Info on ground strap, if any     McCloskey  
SIDU Upgrade for ASIC     Guy  

NIRCam TBD/TBR Progress & Plan