Tuesday Telecon
Tuesday, February 21, 1600 EDT
No NIRCam Telecon today.
|
NIRCam Calendar
| Date |
Event |
Details |
| 2/21/06 |
IRSU SRR |
GSFC |
| 2/22-23/06 |
ISIM FSW PDR |
GSFC |
| 3/23/06 |
NIRCam Monthly |
Tucson, Az |
| 3/28/06 |
NIRCam I&T CDR |
Palo Alto, CA |
| 4/25-27/06 |
JWST Quarterly |
Noordwijk, Netherlands |
| 5/16-17/06 |
NIRCam CDR |
Palo Alto, CA |
| 5/25/06 |
NIRCam Monthly |
GSFC |
| 6/22/06 |
NIRCam Monthly |
Palo Alto, CA |
| 7/20/06 |
NIRCam Monthly |
Palo Alto, CA |
| 8/31/06 |
NIRCam Monthly |
Palo Alto, CA |
|
Last Week's Accomplishments
NIRCam Activities for Week Ending 2/15/06
1) Held a successful FPA CDR.
2) Held a very useful FPE TIM where progress was
made against some of the open ICD issues.
3) Dynaco FPA cables have been received and are
being evaluated for use in development unit SCAs.
4) Flight software held a CDR dry run which revealed
that there were too many open issues with interfaces
to ISIM FSW inthe ASIC and fault management areas to
hold a real CDR now.
5) Submitted NIRCam Spec Rev D.
|
Announcements
NIRCam FPA CDR charts are available on NGIN as JWST-RVW-006193.
NIRCam Monthly charts are in NGIN shared files in the NIRCam folder.
|
NIRCam Top 5
| |
Item |
Status |
Action |
Next Report |
| 1 |
Requirements |
see below |
|
|
| 2 |
Detector Packaging |
waiting for flex cables |
|
|
| 3 |
Budget |
|
|
|
| 4 |
Optical Alignment Plan |
|
|
|
|
Document Status
| DRD |
Title |
Status |
Due |
Comments |
| SE-04 |
Verification Plan |
Rejected |
7/27/05 |
|
| IT-01 |
I&T Plan |
Rejected |
tbd |
|
|
Pending Changes
| Mod |
Mod Descr |
CCR # |
RTC# |
Description |
Cost/No |
Status |
Due |
Comments |
ECD |
| tbd |
Wave 5 |
|
|
Wave 5 Changes |
yes |
RFP |
|
|
|
| |
|
312 |
|
ISIM Reqts Doc Rev A |
yes |
Complete |
|
Adds reliability calcs |
|
| |
|
382 |
|
ISIM Reqts Doc Rev B |
|
Complete |
|
|
|
| |
|
TBD |
|
NIRCam Spec Rev D |
yes |
CM |
|
ISIM RD Rev B, IRD Rev D |
|
| |
|
313 |
|
SOW Rev E (Test Changes) |
Yes |
Complete |
|
|
|
| |
|
339 |
|
MAR Rev B |
Yes |
Complete |
|
Adds S/W QA |
|
| |
|
364 |
|
MICD EO# 1, 2, 3,4 |
Yes |
Complete |
|
|
|
| |
|
385 |
|
IRD Rev D |
Yes |
Complete |
|
|
|
| |
|
tbd |
|
NIRCam ETU Specification |
|
Loop 1 |
|
|
|
| tbd |
|
|
|
Wave 6 Changes |
|
|
|
|
|
| |
|
tbd |
|
IRD Rev E |
|
|
11/30/05 |
|
|
| |
|
|
030A |
FSW Telemetry Rate |
|
Loop 2 |
|
|
|
| |
|
|
034A |
Outgassing Rate |
|
Loop 2 |
|
|
|
| |
|
|
039 |
FAM Cover |
|
Loop 1 |
|
|
|
| |
|
|
036A |
Structural Interface Load |
|
Loop 1 |
|
|
|
| |
|
|
040 |
FWA Power-On Hold |
|
Draft |
|
|
|
| |
|
|
041A |
Radiation |
|
Loop 2 |
|
|
|
| |
|
|
049A |
Handling Procedures |
|
Loop 3 |
|
|
|
| |
|
|
050A |
WFS&C #4 |
|
Loop 1 |
|
|
|
| |
|
|
052A |
Moving Target |
|
Loop 2 |
|
|
|
| |
|
|
054A |
Stray Light #2 |
|
Loop 1 |
|
|
|
| |
|
|
056 |
IRSU |
|
Draft |
|
|
|
| |
|
|
057 |
Optical Alignment #2 |
|
Draft |
|
|
|
| |
|
|
059 |
Launch Loads |
|
Loop 2 |
|
|
|
| |
|
|
062 |
OTE Rev B Prescription |
|
Loop 1 |
|
|
|
| |
|
|
065 |
FOV Changes |
|
Loop 1 |
|
|
|
| |
|
|
067 |
Alignment Accomodation |
|
Loop 1 |
|
|
|
| |
|
|
ISIM-12 |
Image Motion |
|
|
|
|
|
| |
|
|
ISIM-15 |
Static WFE |
|
Loop 3 |
|
|
|
| |
|
|
ISIM-16 |
Reliability |
|
|
|
|
|
|
NIRCam Needs
| Need |
Status |
ECD |
Assigned |
|
| Resolve TBXs in NIRCam Reqts Documents |
See "Pending Changes" above. |
7/31/05 TBR |
Lundquist |
|
| NIRCam Drill template to Axsys |
delayed by funding runout at GSFC |
3/15/06 |
Crow |
|
| ASIC Ops Concept & interface documents |
TIM 12/2/2005 |
|
Dutta |
|
| Spacewire ICD & Spec |
|
|
Aguilar |
|
| Loads from harness/thermal straps |
|
|
Crow |
|
| Info on ground strap, if any |
|
|
McCloskey |
|
| SIDU Upgrade for ASIC |
|
|
Guy |
|
|
NIRCam TBD/TBR Progress & Plan

|
|
|
|