NIRCam News
February 19, 2007
Previous editions are available in the archive.

 

 

Tuesday Telecon

Dial-in: 877-951-3250, Passcode 108321

Date

Meeting Agenda

GSFC Location

Tuesday, Feb 20

11:30 EST

Long Lead GSE CDR

Bld 22, room C399

Tuesday, Feb 27

16:00 EST

NIRCam ICD electrical RTC

Bld 22, room C399

Tuesday, Mar 6

16:00 EST

Optics

Bld 22, room C399

 

Announcements

Agenda for the February NIRCam Long-Lead GSE Review:

Pathfinder Testing (Feb - Aug)                     69 drawings

 

    Filler Rods                     CMA Structure                    Tooling Balls

    Align Targets                  Insertion/Removal Tools       Pivot Posts

    Stick Nudgers                Tapping Tools                     Flexure Locks    

    ¾” Spherical Mirrors       Mickey Mouse Mirrors         Dial Indicators

 

Ø       OBA Component Level Testing (June – Aug)                            18 drawings

 

Shipping Container             Lifting Fixtures                    Rotation Dolly

Vibration Plate

 

Ø       Red Chamber Fac. prep and ringout (June – Aug)                                      14 drawings

 

Chamber Shrouds              Cold Table                          Cryo Plumbing

Double Windows                Shutters

 

Ø       ETU Module Level integration and alignment (Sept)                                 27 drawings

 

SMART Tool                      SFPA                                Fibers

Sources                            Cameras                            Optical Feedthroughs

Nudgers                            Universal Handle

 

NIRCam Calendar

Date

Event

Details

Feb 20, 2007

NIRCam Long-Lead GSE Review


Palo Alto, Video

Feb 22, 2007

NIRCam Monthly

Camarillo

Feb 27-March 1, 2007

Fault Mgmt/ Ops / FSW Summit

GSFC

Mar 22, 2007

NIRCam Monthly

Palo Alto

Mar 28-29, 2007

Optics Summit

Greenbelt, NGST ECO

Apr 26, 2007

NIRCam Monthly

Palo Alto

May 22, 2007

NIRCam Monthly

Palo Alto

May 29, 2007

NIRCam GSE CDR

Palo Alto

June 11-14, 2007

JWST Workshop

Dublin, Ireland

 

Accomplishments of Week Ending 2/13/07

1) Installed Teledyne's data reduction package at Arizona for cross-checking results.

2) Reached agreement with Teledyne on analysis of read noise data from first batch of SCAs.

3) Held a coronagraph and cal source review at ATC.

4) Barr measured the transmitted wavefront error on a prototype filter, and it met requirements.

 

NIRCam Needs (from Jan 29 MSR)

Need

Date Assigned

Assigned to

ECD

Status

Need PSD information and details of mirror segments for higher fidelity coronagraphic modeling

8/31/2006

Mark Clampin

12/1/2006

Ritva to provide delivery date, discuss at Optical Summit meeting on March 28 and 29

Harness and thermal strap loads on bench and struts – needed confirm load on OBA to finalized structural analysis, to complete strut design, and perform OTM analysis on the OA to determine impact on alignment and WFE

8/31/2006

John Crow

 

in process.  Need FPE xsect info

Resolution of intermediate thermal strapping of harnesses

9/26/2006

Ray L

2/13/07

Discussed on 2/6.  ISIM to determine who should do thermal model.

ISIM analysis of NIRCam EOL contamination levels

10/31/2006

Ray Levesque

 Provide schedule by 1/31/07

Need to set up meeting to discuss Model.

Resolve FPE simulator requirements

1/30/2007

Art Ferrer

 

Art will provide further info on simulator requirements

Strut design

-Need to investigate more compliant flexures to reduce the bench warping caused by ISIM pad motions

-Need updated design for updated OTM analysis

10/31/2006

John Crow

 

need allowable stiffness from NIRCam team. 

Resolution of Rogue Path

8/31/2006

Pam Davila

 

Optical Summit meeting on March 28 and 29

Update NIRCam MICD

-ETU test cone of light keep-out zone in module A FAM mass simulator

-Increase volume allocation to accommodate FAM covers

-Resolve descrepencey from EO5 on strut pad to SIIP interface

-Definition of harness interface to NIRCam struts

Sept  2006

Gurnie Hobbs

 

In process

Resolve 7 open TBXs in NIRCam IRD –INCU-1682 & INCU-1783

 

J. Van Campen

 

RTCs on hold until KM design is complete.  Planning Optics meeting to resolve.

Resolve open RTCs

 

J. Van Campen

2/20/07

CCR-676 in process

GSFC approval of submitted RFA Responses

 

 

 

in process

 

 

ISIM Needs

Need

Date Assigned

Assigned to

ECD

Status

KM Strut Design

 

 

 1/16/07

Need completed KM Requirements Document.    NIRCam to complete stiffness sensitivity analysis.  Providing updated schedule assuming requirements complete by Feb 9th.

ICD update to ICE cables section

12/25/06

John McCloskey

2/9/07

In Process.  Need info from NIRCam ICE and FPE

FPE cable cross section dimensions for routing work

 

 

2/6/07

Tony to send xsect dimensions of both cables under consideration.

Input into EOL contamination analysis

 

 

TBD

Need to set up meeting to discuss modeling needs

Test plan for Pathfinder Singlet test and Pathfinder triplet-beamsplitter-triplet test.

 

 

TBD

Received Singlet test plan.  Pathfinder test plan pending completion.

ROM for FPE Software Simulator

 

 

1/31/07

 Pending requirement definition from Art Ferrer.

Provide Data on Passive Friction Device Test.

 

 

1/30/07

ISIM would like to review ASAP.

EM on Lens mount DU tests

 

 

 

ISIM would like this documented and available for review.

 

 

Review RFAs (updated 2/9/07)

CDR RFA

Requester

Action Requested

Assignee

Status

ECD

OBA RFA-3

John Johnston

Peel & shear test, analysis of bonded joints.

Alison Nordt

Need to respond to Johnston's questions.

tbd

OBA RFA-4

John Johnston

Assess MS with FS = 1.5.

Alison Nordt

Need to respond to Johnston's questions.

tbd

OBA RFA-8

Richard Vassar

SE to do independent tolerance analysis

Kevin Bock

Kevin auditing NIR-EM-0152A.  Kurli analyzed optic sensitivity.

tbd

SLB RFA-3

Pam Davila

Worst case clearance analysis.

Brent Biggs

Complete clearance analysis, document and present.

tbd

SLB RFA-5

Pam Davila

STOP analysis results, clearances.

Brent Biggs

Complete OTM analysis, document and present.

tbd

FPA RFA-3

Don Hall

Shielding temp sensor/heater cable.

Erick Young

SPICE model the cable assembly to assess the coupling between  thermometer/heater leads and FPA cable inside the housing.

tbd

I&T-II RFA-4

Bill Eichorn

Correlate warm-to-cold models.

Paul Schweiger

Bill additional request for description of Pathfinder test.

tbd

I&T-II RFA-6

Bill Eichorn

Misalignments in fwd and reverse directions.

Paul Schweiger

Bill requested analysis using wavefront optimization.

tbd

I&T-II RFA-10

John Hagopian

WFE of ambient optics. Null lenses.

Paul Schweiger

John wants ambient WFE w/ null lenses in our Plan. Alan to respond.

Jan-07

I&T-II RFA-11

John Hagopian

Define alignment budget items.

Paul Schweiger

John wants to see the completed analysis. Alan to respond.

Jan-07

I&T-II RFA-14

John Hagopian

Include figure uncertainty in alignment.

Paul Schweiger

John wants to see the completed analysis. Alan to respond.

Jan-07

I&T-II RFA-15

John Hagopian

VIRATAC on each optical element.

Paul Schweiger

John wants to see the completed analysis. Alan to respond.

Jan-07

SYS RFA-4

Pam Davila

Cold triplet & DBS interferometer tests.

Roger Potash

DBS done; awaiting triplet test.

March, 2007

SYS RFA-13

Tom McCarthy

Why not 4 TV cycles? Margins?

Roger Potash

Closed.

tbd

SYS RFA-15

Gene Gochar

Plan to deliver Flight ready optics

Todd Kvamme

Awaiting Gene's approval of submitted response.

tbd

SYS RFA-22

Eugene Waluschka

Measure S&P R/T for optic surfaces.

Yalan Mao

Yalan conducted ray trace analysis; needs Lynn, Scott's ok.

31-Jan-07

 

 

Document Status

DRD

Title

Status

Due

Comments

SA-02

Contamination Control Plan

Returned for changes

9/8/2006

See JWST-MEMO-6835, requested

for resubmittal last June.

SE-04

Verification Plan

Disapproved

11/8/2006

See JWST-MEMO-6957

SE-10

Math Models

Returned with comments

11/8/2006

See JWST-MEMO-7015 regarding mechanical models only, partially

rejected in August with requested resubmittal in 90 days.

IT-01

I&T Plan

Delivered

ETU I&T
-3 months

 

FSW-01

FSW Product Plan

needs update

 

See JWST-MEMO-4063

FSW-02

FSW Vision Doc

needs update

 

See-JWST-MEMO-4210

FSW-03

FSW Reqts Spec

returned w/ comments

1/9/2007

Accepted with comments in mid-November with a requested update due in

60 days (mid-January)

OPS-11

Ops Concept

needs update

 

See JWST-MEMO-4518

PM-01

Proj Mgmt Plan

approved

 

 

SI-09

K-Mounts Reqts

returned w/comments

12/31/2006

accepted with comments in late November with a requested update due in 30 days.

SE-01

Sys Engr Plan

approved

 

 

 

 

Pending Changes (updated 1/12/07)

Mod

CCR #

RTC#

Description

Cost

Status

Due

Comments

tbd

 

 

Wave 6 Cost Changes

yes

Tech Eval

 

 

 

543

 

NIRCam SOW Rev F

yes

Complete

 

 

tbd

 

 

Wave 7 Changes

 

 

 

 

 

593

 

ETU Spec

 

Complete

 

 

 

 

 

IRD Rev G (Final Rev for ETU)

yes

CCR

 

 

 

 676

34J

Outgassing Rate

 

CCR

 1/15/07

 

 

 676

56G

Electrical Changes

 

CCR

 1/15/07

 

 

 676

66A

Grounding

 

CCR

 1/15/07

 

 

 676

68C

ICE Sync Changes

 

CCR

 1/15/07

 

 

 676

70B

ICP A

 

CCR

 1/15/07

 

 

 676

71H

Struts

 

CCR

 1/15/07

 

 

 676

73A

Telemetry Rate TBRs

 

CCR

 1/15/07

 

 

 676

74D

MIPS

 

CCR

 1/15/07

 

 

 676

76B

FSW Data Rate

 

CCR

 1/15/07

 

 

 676

78D

Longwave Grism

 

CCR

 1/15/07

 

 

 676

79E

FSW Changes

 

CCR

 1/15/07

 Revision to be submitted to existing CCR

 

 676

81C

Static Envelope

 

CCR

 1/15/07

 

 

 676

82B

Fuse Blow Transient

 

CCR

 1/15/07

 

 

 676

87B

Post CDR Thermal Updates 2

 

CCR

 1/15/07

 

 

 676

88A

WFS-DHS Positioning

 

CCR

 1/15/07

 

 

 676

89D

EMC

 

CCR

 1/15/07

 

 

 676

90A

Harness Update

 

CCR

 1/15/07

 

 

 676

91A

Surface Cleanliness

 

CCR

 1/15/07

 

 

 676

92C

LVDS Signals

 

CCR

 1/15/07

 

 

 676

93A

Voltage Ripple

 

CCR

 1/15/07

 

 

 676

94B

WFS Filters

 

CCR

 1/15/07

 

 

676

096A

Misc Updates

 

CCR

1/15/07

 

 

676

097A

ICE Box Envelope

 

CCR Comment/walk-on RTC

1/15/07

 

 

 

 

Wave 8 Changes

 

 

 

 

 

 

 

IRD Rev H

 

 

 

 

 

 

65A

FOV Changes

 

Loop 1

 

 Discuss Optical Summit on March 28/29.

 

 

67B

Alignment Changes

 

Loop 1

 

 Pending NIRCam response and KM analysis.

 

 

 

 

 

ISIM Level NIRCam Risks (updated 1/3/07)

Number

Title

Impact

Likelihood

Rating

NIRCam-32

NIRCam Lens Mounts

C

A

Low

NIRCam-138

NIRCam Wavefront Error (low/mid/high sf)

D

B

Medium

NIRCam-143

NIRCam Optical Transmission

C

B

Low

NIRCam-191

NIRCam Detector BCS Failures

C

A

Low

NIRCam-250

NIRCam Region 1 Heat Transfer

B

C

Medium

NIRCam-251

NIRCam Optical Alignment

C

B

Low

NIRCam -280

Extra Module-level cryotest with FPAs integrated

 

 

 

 

NIRCam Level NIRCam Risks (updated with 1/29/07 MSR)

 

 

Acronym List

ASIC

Application-Specific Integrated Circuit

ASMIF

Ambient Science Instrument Mechanical Interface Fixture

BCS

Balance Composite Structure

CCDH

Common Command & Data Handling

CMLB

Ceramic Multi-Layer Board

CPT

Comprehensive Performance Test

DBS

Dichroic Beam Splitter

DHS

Dispersed Hartmann Sensor

EEE

Electrical, Electronic, and Electromechanical (Parts)

EOL

End-of-life

ETU

Engineering Test Unit

FOV

Field of View

FPA

Focal Plane Assembly

FPE

Focal Plane Electronics

FSW

Flight Software

GSFC

Goddard Space Flight Center

GSE

Ground Support Equipment

I&T

Integration & Test

ICD

Interface Control Document

ICE

Instrument Control Electronics

ICP

Interconnect Panel

IRD

Interface Requirements Document

IOS

ISIM-to-OTE-and-Spacecraft

ISIM

Integrated Science Instrument Module

KM

Kinematic Mount

MIPS

Million Instructions Per Second

MRR

Manufacturing Readiness Review

NGIN

Next Generation Integrated Network

OA

Optics Assembly

OBA

Optical Bench Assy

OOB

Out of Band

OTE

Optical Telescope Element

PAR

Pupil Alignment Reference

PDR

Preliminary Design Review

PFD

Passive Friction Device

PIL

Pupil Imaging Lens

PSD

Power Spectral Density

RFA

Request for Action

RTC

Request for Technical Coordination

Rx

Prescription

SCA

Sensor Chip Assembly

SOW

Statement of Work

STOP

Structural, Thermal, Optical (Analysis)

SWG

Science Working Group

TBR

To Be Reviewed

TIMs

Technical Interchange Meeting

T-NAR

Technology Non-Advocate Review

TV

Thermal Vacuum

UPS

Uninterruptible Power Supply

WFE

Wavefront Error

WFS

Wavefront Sensing