NIRCam News
January 29, 2007
Previous editions are available in the archive.

 

 

Tuesday Telecon

Dial-in: 877-951-3250, Passcode 108321

Date

Meeting Agenda

GSFC Location

Tuesday, Jan 30

16:00 EST

NIRCam MICD EO8 Review

Bld 22, room C365

Tuesday, Feb 6 

16:00 EST

Mechanism Micro-dynamics Measurement

Bld 22, room C399

 

 

Announcements

Stay tuned for an agenda for the February NIRCam Long-Lead GSE Review.  See changed date below.

 

 

NIRCam Calendar

Date

Event

Details

1/29/07

Time:  2 pm EST

NIRCam Monthly

GSFC, Bld 22 Rm 399, video

Jan 30-31, 2007

JWST T-NAR

GSFC

Feb 8, 2007

FOV Discussion

Ball, Boulder Co

Feb 20, 2007

NIRCam Long-Lead GSE Review

Palo Alto, Video

Feb 22, 2007

NIRCam Monthly

Camarillo

Feb 27-March 1, 2007

Fault Mgmt/ Ops / FSW Summit

GSFC

Mar 22, 2007

NIRCam Monthly

Palo Alto

Mar 28-29, 2007

Optics Summit

Greenbelt, NGST ECO

Apr 26, 2007

NIRCam Monthly

Palo Alto

May 22, 2007

NIRCam Monthly

Palo Alto

May 29, 2007

NIRCam GSE CDR

Palo Alto

June 11-14, 2007

JWST Workshop

Dublin, Ireland

 

 

 

Accomplishments of Week Ending 1/23/07

1) An ETU LiF lens was successfully mounted and mesaured at

room temperature where the applied streses will be highest. The

transmitted WFE was 14nm, well below the budget of 25nm.

 

2) Discussed issues in producing an FPE simulator, and a

high fidelity software simulator may be problematic for the

NIRCam Team to produce.

 

3) Manufacturing of PIL prototype lenses is proceeding with one

side of lenses polished and the second side in process.

 

4) Two more cable assemblies are in thermal cycle testing.

 

 

NIRCam Needs (from Dec 19 MSR)

Need

Date Assigned

Assigned to

ECD

Status

Need PSD information and details of mirror segments for higher fidelity coronagraphic modeling

8/31/2006

Mark Clampin

12/1/2006

Ritva to provide delivery date, discuss at Optical Summit meeting on March 28 and 29

Changes to SIIP/Strut pad dimensions

10/31/2006

John Crow

 

Issue resolved – ICD change in work

Any changes to PAR?

10/31/2006

Pam Davila

 

work between B. Bos and S. Somerstein ongoing.

Harness and thermal strap loads on bench & struts

8/31/2006

John Crow

 

 in process.  Need FPE xsect info

ISIM CCDH FSW Rev 6.0 installed on SIDU including Spacewire interface and function call for ASIC micro-codes

8/31/2006

Mark Voyton

 

Not until Jan 2007.  Scott Lambros to discuss with Pam S.

Resolution of Rogue Path

8/31/2006

Pam Davila

 

Optical Summit meeting on March 28 and 29

Resolve open TBXs in IRD & ISIM Reqs Doc

8/31/2006

Julie

 

 See RTC list below

Resolve open RTCs in IRD, ISIM Reqts, ICD

8/31/2006

Julie

 

See RTC list below

Define intermediate thermal stationing of harnesses

9/26/2006

Ray L

 2/13/07

 Need to schedule meeting to discuss thermal budget of ICE harnesses.

Clarify workmanship vibe levels

9/26/2006

John Crow

 

complete

ISIM analysis of NIRCam EOL contamination levels

10/31/2006

Ray Levesque

 Provide schedule by 1/31/07

Need to set up meeting to discuss Model.

Envelope Notch for ETU cones of light

10/31/2006

John Crow

 Review EO8 on 1/16/07

notch identified – MICD change in process

KM Strut Design

10/31/2006

John Crow

 

need allowable forces/moments from NIRCam team. 

 

 

 

 

ISIM Needs

Need

Date Assigned

Assigned to

ECD

Status

KM Strut Design

 

 

 1/16/07

Need completed KM Requirements Document.  John Johnston to send NIRCam predicted pad locations from ISIM PDR.  NIRCam to complete stiffness sensitivity analysis.

ICD update to ICE cables section

12/25/06

John McCloskey

2/9/07

In Process, Next meeting on Feb 6th.

FPE cable cross section dimensions for routing work

 

 

2/6/07

Tony to send xsect dimensions of both cables under consideration.

Input into EOL contamination analysis

 

 

TBD

Need to set up meeting to discuss modeling needs

Test plan for Pathfinder Singlet test and Pathfinder triplet-beamsplitter-triplet test.

 

 

TBD

Received Singlet test plan.  Pathfinder test plan pending completion.

ROM for FPE Software Simulator

 

 

1/31/07

Scott L. to talk with Marcia

SITS to SWTS2 upgrade

 

 

1/31/07

Set up meeting to discuss needs

Provide Data on Passive Friction Device Test.

 

 

1/30/07

ISIM would like to review ASAP.

EM on Lens mount DU tests

 

 

 

ISIM would like this documented and available for review.

 

 

Review RFAs (updated 1/26/07)

CDR RFA

Requester

Action Requested

Assignee

Status

ECD

OBA RFA-3

John Johnston

Peel & shear test, analysis of bonded joints.

Alison Nordt

Alison preparing response to John's review questions.

Aug-06

OBA RFA-4

John Johnston

Assess MS with FS = 1.5.

Alison Nordt

Alison preparing response to John's review questions.

Aug-06

OBA RFA-8

Richard Vassar

SE to do independent tolerance analysis

Kevin Bock

Kevin auditing NIR-EM-0152A.  Kurli analyzed optic sensitivity.

Dec-06

SLB RFA-3

Pam Davila

Worst case clearance analysis.

Brent Biggs

Complete clearance analysis, document and present.

Sep-06

SLB RFA-5

Pam Davila

STOP analysis results, clearances.

Brent Biggs

Complete OTM analysis, document and present.

Sep-06

FPA RFA-3

Don Hall

Shielding temp sensor/heater cable.

Erick Young

Build a simplified SPICE model of the cable assembly to assess the coupling between the thermometer/heater leads and the FPA cable inside the housing.

Jul-06

I&T-II RFA-4

Bill Eichorn

Correlate warm-to-cold models.

Paul Schweiger

Bill additional request for description of Pathfinder test.

tbd

I&T-II RFA-6

Bill Eichorn

Misalignments in fwd and reverse directions.

Paul Schweiger

Bill requested analysis using wavefront optimization.

tbd

I&T-II RFA-10

John Hagopian

WFE of ambient optics. Null lenses.

Paul Schweiger

John wants ambient WFE w/ null lenses in our Plan.

Jan-07

I&T-II RFA-11

John Hagopian

Define alignment budget items.

Paul Schweiger

John wants to see the completed analysis.

Jan-07

I&T-II RFA-14

John Hagopian

Include figure uncertainty in alignment.

Paul Schweiger

John wants to see the completed analysis.

Jan-07

I&T-II RFA-15

John Hagopian

VIRATAC on each optical element.

Paul Schweiger

John wants to see the completed analysis.

Jan-07

SYS RFA-4

Pam Davila

Cold triplet & DBS interferometer tests.

Roger Potash

DBS done; awaiting triplet test.

1-Feb-07

SYS RFA-7

Steve Graham

Tiodize baffle internal surfaces v Z306.

Roger Potash

Awaiting Steve’s approval of re-submitted response.  (Submitted 1/29/07)

7-Jan-07

SYS RFA-13

Tom McCarthy

Why not 4 TV cycles? Margins?

Roger Potash

Awaiting Tom's approval of re-submitted response. (submitted 1/4/07)

tbd

SYS RFA-15

Gene Gochar

Plan to deliver Flight ready optics

Todd Kvamme

Awaiting Gene's approval of submitted response. (submitted 1/10/07)

tbd

SYS RFA-22

Eugene Waluschka

Measure S&P R/T for optic surfaces.

Yalan Mao

Yalan to conduct a ray trace analysis.

tbd

 

 

 

Document Status

DRD

Title

Status

Due

Comments

SA-02

Contamination Control Plan

Returned for changes

9/8/2006

See JWST-MEMO-6835

SE-04

Verification Plan

Disapproved

11/8/2006

See JWST-MEMO-6957

SE-10

Math Models

Returned with comments

11/8/2006

See JWST-MEMO-7015 regarding mechanical models only

IT-01

I&T Plan

Delivered

ETU I&T
-3 months

 

FSW-01

FSW Product Plan

needs update

 

See JWST-MEMO-4063

FSW-02

FSW Vision Doc

needs update

 

See-JWST-MEMO-4210

FSW-03

FSW Reqts Spec

returned w/ comments

1/9/2007

 

OPS-11

Ops Concept

needs update

 

See JWST-MEMO-4518

PM-01

Proj Mgmt Plan

approved

 

 

SI-09

K-Mounts Reqts

returned w/comments

12/31/2006

 KM redesign pending new requirements.  NIRCam must respond to Memo on this document before the RD becomes official

SE-01

Sys Engr Plan

approved

 

 

 

 

Pending Changes (updated 1/12/07)

Mod

CCR #

RTC#

Description

Cost

Status

Due

Comments

tbd

 

 

Wave 6 Cost Changes

yes

Tech Eval

 

 

 

543

 

NIRCam SOW Rev F

yes

Complete

 

 

tbd

 

 

Wave 7 Changes

 

 

 

 

 

593

 

ETU Spec

 

Complete

 

 

 

 

 

IRD Rev G (Final Rev for ETU)

yes

CCR

 

 

 

 676

34J

Outgassing Rate

 

CCR

 1/15/07

 

 

 676

56G

Electrical Changes

 

CCR

 1/15/07

 

 

 676

66A

Grounding

 

CCR

 1/15/07

 

 

 676

68C

ICE Sync Changes

 

CCR

 1/15/07

 

 

 676

70B

ICP A

 

CCR

 1/15/07

 

 

 676

71H

Struts

 

CCR

 1/15/07

 

 

 676

73A

Telemetry Rate TBRs

 

CCR

 1/15/07

 

 

 676

74D

MIPS

 

CCR

 1/15/07

 

 

 676

76B

FSW Data Rate

 

CCR

 1/15/07

 

 

 676

78D

Longwave Grism

 

CCR

 1/15/07

 

 

 676

79E

FSW Changes

 

CCR

 1/15/07

 Revision to be submitted to existing CCR

 

 676

81C

Static Envelope

 

CCR

 1/15/07

 

 

 676

82B

Fuse Blow Transient

 

CCR

 1/15/07

 

 

 676

87B

Post CDR Thermal Updates 2

 

CCR

 1/15/07

 

 

 676

88A

WFS-DHS Positioning

 

CCR

 1/15/07

 

 

 676

89D

EMC

 

CCR

 1/15/07

 

 

 676

90A

Harness Update

 

CCR

 1/15/07

 

 

 676

91A

Surface Cleanliness

 

CCR

 1/15/07

 

 

 676

92C

LVDS Signals

 

CCR

 1/15/07

 

 

 676

93A

Voltage Ripple

 

CCR

 1/15/07

 

 

 676

94B

WFS Filters

 

CCR

 1/15/07

 

 

676

096A

Misc Updates

 

CCR

1/15/07

 

 

676

097A

ICE Box Envelope

 

CCR Comment/walk-on RTC

1/15/07

 

 

 

 

Wave 8 Changes

 

 

 

 

 

 

 

IRD Rev H

 

 

 

 

 

 

65A

FOV Changes

 

Loop 1

 

 Discuss Optical Summit on March 28/29.

 

 

67B

Alignment Changes

 

Loop 1

 

 Pending NIRCam response and KM analysis.

 

 

 

 

 

NIRCam Risks (updated with 12/19/06 MSR)

Number

Title

Impact

Likelihood

Rating

NIRCam ISIM-Level Risks

 

 

 

NIRCam-32

NIRCam Lens Mounts

C

A

Low

NIRCam-138

NIRCam Wavefront Error (low/mid/high sf)

D

B

Medium

NIRCam-143

NIRCam Optical Transmission

C

B

Low

NIRCam-191

NIRCam Detector BCS Failures

C

A

Low

NIRCam-250

NIRCam Region 1 Heat Transfer

B

C

Medium

NIRCam-251

NIRCam Optical Alignment

C

B

Low

NIRCam -280

Extra Module-level cryotest with FPAs integrated

 

 

 

NIRCam-Level Risks

 

 

 

28

OBA Damage

D

C

Medium

15

SCA Delivery Impacts I&T Schedule

D

B

Medium

4

Region 1 Heat Transfer

D

C

Medium

34

FPE to ASIC Harness Design

D

A

Low

45

WFE due to Bench Distortion

C

C

Medium

80

Optical Throughput due to Contamination

C

D

Medium

33

I&T GSE Design and Fab not in time for I&T

C

C

Medium

35

Optical Triplets and DBS Mount Distortion

C

C

Medium

8

FPE Parts Qualification

C

C

Medium

78

WFE Degradation due to I&T tolerance exceedance

C

C

Medium

79

Optical throughput loss due to coatings

C

C

Medium

16

Sensitivity loss due to FPA/ASIC/FPE/cable noise

C

C

Medium

 

 

Acronym List

ASIC

Application-Specific Integrated Circuit

ASMIF

Ambient Science Instrument Mechanical Interface Fixture

BCS

Balance Composite Structure

CCDH

Common Command & Data Handling

CMLB

Ceramic Multi-Layer Board

CPT

Comprehensive Performance Test

DBS

Dichroic Beam Splitter

DHS

Dispersed Hartmann Sensor

EEE

Electrical, Electronic, and Electromechanical (Parts)

EOL

End-of-life

ETU

Engineering Test Unit

FOV

Field of View

FPA

Focal Plane Assembly

FPE

Focal Plane Electronics

FSW

Flight Software

GSFC

Goddard Space Flight Center

GSE

Ground Support Equipment

I&T

Integration & Test

ICD

Interface Control Document

ICE

Instrument Control Electronics

ICP

Interconnect Panel

IRD

Interface Requirements Document

IOS

ISIM-to-OTE-and-Spacecraft

ISIM

Integrated Science Instrument Module

KM

Kinematic Mount

MIPS

Million Instructions Per Second

MRR

Manufacturing Readiness Review

NGIN

Next Generation Integrated Network

OA

Optics Assembly

OBA

Optical Bench Assy

OOB

Out of Band

OTE

Optical Telescope Element

PAR

Pupil Alignment Reference

PDR

Preliminary Design Review

PFD

Passive Friction Device

PIL

Pupil Imaging Lens

PSD

Power Spectral Density

RFA

Request for Action

RTC

Request for Technical Coordination

Rx

Prescription

SCA

Sensor Chip Assembly

SOW

Statement of Work

STOP

Structural, Thermal, Optical (Analysis)

SWG

Science Working Group

TBR

To Be Reviewed

TIMs

Technical Interchange Meeting

T-NAR

Technology Non-Advocate Review

TV

Thermal Vacuum

UPS

Uninterruptible Power Supply

WFE

Wavefront Error

WFS

Wavefront Sensing