NIRCam News
January 23, 2006
Previous editions are available in the archive.
|
Tuesday Telecon
Tuesday, January 24, 1600 EDT
No telecon this week due to the SDR.
|
NIRCam Calendar
| Date |
Event |
Details |
| 1/24-26/06 |
JWST Mission SDR |
GSFC |
| 1/25/06 |
NIRCam TBD/RTC Mtg |
GSFC, 1430 EST |
| 1/31-2/2/06 |
JWST SWG |
Redondo Bch, CA |
| 2/17/06 |
NIRCam ICE CDR |
Palo Alto, CA |
| 2/9/06 |
NIRCam FPE CDR |
Palo Alto, CA |
| 2/8/06 |
FPA CDR |
Palo Alto, CA |
| 2/15/06 |
NIRCam FSW CDR |
Palo Alto, CA |
| 2/16/06 |
NIRCam Monthly |
Palo Alto, CA |
| 2/21/06 |
IRSU SRR |
GSFC |
| 2/22-23/06 |
ISIM FSW PDR |
GSFC |
| 3/23/06 |
NIRCam Monthly |
Tucson, Az |
| 3/28/06 |
NIRCam I&T CDR |
Palo Alto, CA |
| 4/25-27/06 |
JWST Quarterly |
Noordwijk, Netherlands |
| 5/25/06 |
NIRCam Monthly |
GSFC |
| 6/22/06 |
NIRCam Monthly |
Palo Alto, CA |
| 7/20/06 |
NIRCam Monthly |
Palo Alto, CA |
| 8/31/06 |
NIRCam Monthly |
Palo Alto, CA |
|
Last Week's Accomplishments
NIRCam Activities for Week Ending 1/17/06
1) A second, simpler, prototype for a discrete-wire SCA cable has been
built and may become the baseline because Dynaco has slipped its delivery further.
2) ASIC testing at Hawaii is proceeding, and the preliminary tests
confirm that the last round of changes have fixed the problems with
operating at 37K.
3) All ETU lenses are well into production with the ZnSe already being
polished.
4) A vendor (Coastal Optical Systems) has been seleted for the PIL optics.
|
Announcements
NIRCam January Monthly charts are available on NGIN as JWST-RPT-006091.
JWST System Definition Review charts are available on NGIN as JWST-PRES-006017 (agenda with hyperlinks to all presentations).
|
NIRCam Top 5
| |
Item |
Status |
Action |
Next Report |
| 1 |
Requirements |
see below |
|
|
| 2 |
Detector Packaging |
waiting for flex cables |
|
|
| 3 |
Budget |
|
|
|
| 4 |
Optical Alignment Plan |
|
|
|
|
Document Status
| DRD |
Title |
Status |
Due |
Comments |
| SE-04 |
Verification Plan |
Rejected |
7/27/05 |
|
| IT-01 |
I&T Plan |
Rejected |
tbd |
On hold for resolution of NOTES testing plan. |
| SA-14 |
Safety Plan |
Review & Comment |
8/15/05 |
Delivered 7/29/05 |
|
Pending Changes
| Mod |
Mod Descr |
CCR # |
RTC# |
Description |
Cost/No |
Status |
Due |
Comments |
ECD |
| tbd |
Launch Slip |
|
|
22-mo Launch Slip, 10-mo delivery slip |
|
Pre-Neg |
|
|
|
| |
|
334 |
|
10-month delivery slip |
yes |
Complete |
|
|
|
| |
|
361 |
|
22-mo launch slip |
yes |
Complete |
|
|
|
| |
|
436 |
|
add'l delivery slip |
no |
Comment |
|
|
|
| |
|
tbd |
|
GFE List Replan Updates |
no |
draft |
|
|
|
| tbd |
Wave 5 |
|
|
Wave 5 Changes |
yes |
RFP |
|
waiting for IRD
|
|
| |
|
312 |
|
ISIM Reqts Doc Rev A |
yes |
Complete |
|
Adds reliability calcs |
|
| |
|
382 |
|
ISIM Reqts Doc Rev B |
|
Complete |
|
|
|
| |
|
TBD |
|
NIRCam Spec Rev D |
yes |
draft |
|
ISIM RD Rev B, IRD Rev D |
|
| |
|
313 |
|
SOW Rev E (Test Changes) |
Yes |
Complete |
|
|
|
| |
|
339 |
|
MAR Rev B |
Yes |
Complete |
|
Adds S/W QA |
|
| |
|
364 |
|
MICD EO# 1, 2, 3,4 |
Yes |
Complete |
|
|
|
| |
|
385 |
|
IRD Rev D |
Yes |
CCB |
|
|
|
| |
|
tbd |
|
NIRCam ETU Specification |
|
Loop 1 |
|
|
|
| tbd |
|
|
|
Wave 6 Changes |
|
|
|
|
|
| |
|
tbd |
|
IRD Rev E |
|
|
11/30/05 |
|
|
| |
|
|
030A |
FSW Telemetry Rate |
|
Loop 2 |
|
|
|
| |
|
|
034A |
Outgassing Rate |
|
Loop 3 |
|
|
|
| |
|
|
039 |
FAM Cover |
|
Loop 1 |
|
|
|
| |
|
|
036A |
Structural Interface Load |
|
Loop 1 |
|
|
|
| |
|
|
040 |
FWA Power-On Hold |
|
Draft |
|
|
|
| |
|
|
041A |
Radiation |
|
Loop 2 |
|
|
|
| |
|
|
049A |
Handling Procedures |
|
Loop 3 |
|
|
|
| |
|
|
050A |
WFS&C #4 |
|
Loop 1 |
|
|
|
| |
|
|
052A |
Moving Target |
|
Loop 2 |
|
|
|
| |
|
|
054A |
Stray Light #2 |
|
Loop 1 |
|
|
|
| |
|
|
056 |
IRSU |
|
Draft |
|
|
|
| |
|
|
057 |
Optical Alignment #2 |
|
Draft |
|
|
|
| |
|
|
059 |
Launch Loads |
|
Loop 2 |
|
|
|
| |
|
|
062 |
OTE Rev B Prescription |
|
Loop 1 |
|
|
|
| |
|
|
065 |
FOV Changes |
|
Loop 1 |
|
|
|
| |
|
|
067 |
Alignment Accomodation |
|
Loop 1 |
|
|
|
| |
|
|
ISIM-12 |
Image Motion |
|
|
|
|
|
| |
|
|
ISIM-15 |
Static WFE |
|
|
|
|
|
| |
|
|
ISIM-16 |
Reliability |
|
|
|
|
|
|
NIRCam Needs
| Need |
Status |
ECD |
Assigned |
|
| Resolve TBXs in NIRCam Reqts Documents |
See "Pending Changes" above. |
7/31/05 TBR |
Lundquist |
|
| NIRCam Drill template to Axsys |
delayed by funding runout at GSFC |
3/15/06 |
Crow |
|
| Cryo refractive index measurements of Si |
Fused Silica complete, Si in progress |
|
Leviton |
|
| ASIC Ops Concept & interface documents |
TIM 12/2/2005 |
|
Dutta |
|
| Spacewire ICD & Spec |
|
|
Aguilar |
|
| Loads from harness/thermal straps |
|
|
Crow |
|
| Info on ground strap, if any |
|
|
McCloskey |
|
| SIDU Upgrade for ASIC |
|
|
Guy |
|
|
NIRCam TBD/TBR Progress & Plan

|
|
|
|